Title Page
-
Job Number
-
Conducted on
-
Prepared by
-
Client Name
-
EMPLOYEE NAME who accomplished the fit out of an item
-
DATE STARTED the fabrication of an item
-
DATE FINISHED the fitout of the item
-
DISPATCH DATE
ACTIVITIES
-
REVIEW FACTORY ORDER
-
CHECK FACTORY DRAWINGS
-
CHECK TANK FOR IMPERFECTIONS (EG: CRACKS) PATCH IF REQUIRED
-
Production Supervisor to review all imperfections
-
Collect the signature of the Production Supervisor as approval to release the product
-
Production Supervisor to assign the task to get imperfections fixed
-
Production Supervisor to review all imperfections required the fix
-
VERIFY ALL MEASUREMENTS
-
REFER TO DRAWING TO ENSURE ENTRE JOB IS FINISHED (INCLUDING RISERS OR ANY EXTRAS)
TRANSPORT INTEGRITY CHECK
-
Attache photos of all marks
-
REVIEW ORDERS AND DRAWINGS TO CHECK ALL TANKS ARE MARKED CORRECTLY
-
Attache photos of all loaded items properly fixed and ready for transportation
-
FINAL LOAD CHECK ALL ITEMS LOADED ACCORDING TO DRAWINGS AND PLANS, INC RISERS, SIKA FLEX, ETC
-
Attach photo of the delivery docket given to the driver
-
ENSURE DRIVER HAS CORRECT DELIVERY ADDESS, AND AWARE OF ONSITE ARRIVAL TIME AND CONTACTS
DRIVER CONTACT DETAILS
-
Name:
-
Contact phone #
-
Email PDF Report to nash@australiantanks.com