JOB INFO
-
FRAME / INSTALL AREA
-
PROJECT MANAGER
-
CONTRACTOR
-
PROJECT
-
Conducted on
-
FOREMAN
QA/QC
-
GLAZING
-
QA / QC
LOCATION
-
Add media
-
FLOOR / ELEVATION / FRAME #
-
PRE-INSTALLATION
-
Add media
-
CHECKED EMBED LAYOUT, CONDITION OF EMBEDS
-
CORRECTIVE ACTION REQUIRED
-
Add media
-
CHECKED AND ACCEPT INSTALLATION AREA BEFORE STARTING WORK
-
CORRECTIVE ACTION REQUIRED
-
Add media
-
DETERMINE PROPER SEQUENCING OF MEMBRANE
-
COMMENT
-
WINDOW SUPPORT SYSTEM INSTALLED TRUE TO APPROVED DETAILS AND ENGINEER'S REQUIREMENTS
-
CORRECTIVE ACTION REQUIRED
-
Add media
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
INSTALLATION
-
Add media
-
FRAMES ERECTED PLUMB AND LEVEL, OR TO DESIGN SPECIFICATION
-
CORRECTIVE ACTION REQUIRED
-
FRAME ADEQUATELY FITS IN OPENING PROVIDED
-
CORRECTIVE ACTION REQUIRED
-
MATERIALS - ALL MATERIALS ARE AS SPECIFIED, DAMAGE-FREE, AND CORRECT FOR INSTALLATION LOCATION
-
CORRECTIVE ACTION REQUIRED
-
PERIMETER AIR/WATER BARRIER INSTALLED PER INDUSTRY STANDARDS AND APPROVED DETAILS
-
CORRECTIVE ACTION REQUIRED
-
JOINT PLUGS ARE INSTALLED AND PROPERLY SEALED
-
CORRECTIVE ACTION REQUIRED
-
GASKETS ARE INSTALLED, TRIMMED TO LENGTH AND SEALED
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
SITE GLAZING
-
Add media
-
ALL SURFACES IN ADHESION WITH SEALANTS ARE CLEANED AND PREPPED AS PER MANUFACTURER'S RECOMMENDATIONS
-
CORRECTIVE ACTION REQUIRED
-
GASKETS CLEANED AND JOINERY CAULKED
-
CORRECTIVE ACTION REQUIRED
-
SETTING BLOCKS, GASKETS, AND SHIMS INSTALLED PER DETAIL AND ENGINEERING REQUIREMENTS
-
CORRECTIVE ACTION REQUIRED
-
HEAL CORNER BEADS APPLIED PRIOR TO UNIT INSTALLATION
-
CORRECTIVE ACTION REQUIRED
-
SPANDRELS/BACK PANS INSTALLED AND SEALED AS PER DRAWINGS
-
CORRECTIVE ACTION REQUIRED
-
GLASS CLEARLY MARKED AS INSTALLED (IF IN HIGH RISK OR HIGH TRAFFIC AREAS)
-
CORRECTIVE ACTION REQUIRED
-
MANUFACTURER'S LABELS REMOVED
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
PRESSURE PLATE, BEAUTY CAP, AND FINISH FLASHING
-
Add media
-
PRESSURE PLATE AND BEAUTY CAP INSTALLED
-
CORRECTIVE ACTION REQUIRED
-
JOINERY SEALED AT ALL PRESSURE PLATE JOINT LOCATIONS
-
CORRECTIVE ACTION REQUIRED
-
FINISH FLASHING INSTALLED PER SPECIFICATION AND DESIGN DRAWINGS
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
DOOR INSTALLATION
-
Add media
-
DOORS INSTALLED PLUMB, LEVEL, AND SQUARE; COMPONENTS OPERATE SMOOTHLY AND CONSISTENTLY
-
CORRECTIVE ACTION REQUIRED
-
DOOR HARDWARE INSTALLED TO SPECIFICATION AND DESIGN DRAWINGS
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
VENT INSTALLATION
-
Add media
-
OPENING PREPPED - GASKETS ARE CLEANED / JOINERY CAULKED
-
CORRECTIVE ACTION REQUIRED
-
VENT GASKETS, CAULKING AND SHIMS INSTALLED PER APPROVED DETAIL
-
CORRECTIVE ACTION REQUIRED
-
PERIMETER SEALS INSPECTED (BACKER RODS, CAULKING & CLEAN
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
SPECIALTY GLAZING
-
Add media
-
SPECIALTY GLAZING
OTHER INSTALLATION
-
SPECIALTY ITEMS INSTALLED AS PER SPECIFICATION AND DESIGN REQUIREMENTS
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
CLADDING
-
QA/QC
LOCATION
-
Add media
-
FLOOR / ELEVATION / GRID REFERENCE
-
START UP
-
Add media
-
EXAMINATION - CHECK AND ACCEPT INSTALLATION AREA AND JOB SITE CONDITIONS BEFORE COMMENCING WORK
-
CORRECTIVE ACTION REQUIRED
-
PREPARATIONS - SUBSTRATE IS DRY AND FREE OF MOISTURE, FROST, OIL, AND DUST
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
MATERIALS
-
Add media
-
MATERIALS USED IN SYSTEM
- PRIMER
- VAPOUR BARRIER
- THRU WALL FLASHING
- INSULATION
- THERMALLY BROKEN CLADDING SUPPORT SYSTEM
- ALUMINUM WALL PANELS - 1.0mm KALZIP PANELS - FREE OF DENTS AND DAMAGE / FINISH HAS BEEN CHECKED FOR FADING, CRACKING, AND DISCOLORATION
- METAL WALL PANELS - 24 GAUGE SNAP LOCK II 675 PANELS - FREE OF DENTS AND DAMAGE / FINISH HAS BEEN CHECKED FOR FADING, CRACKING, AND DISCOLORATION
- FLASHING - 24 GAUGE STEEL - FINISH SAME AS THE CORRESPONDING CLADDING
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE
-
INSTALLATION
-
Add media
-
VAPOUR BARRIER - LAPPED A MINIMUM OF 50 mm / ENSURE PROPER SHINGLING
-
CORRECTIVE ACTION REQUIRED
-
THRU WALL FLASHING - INSTALLATION OF FLASHING AS SPECIFIED IN THE SHOP DRAWINGS OR AS REQUIRED
-
CORRECTIVE ACTION REQUIRED
-
INSULATION - INSTALLED WITH MINIMAL VOIDS, SAGGING, AND NO OVER COMPRESSION
-
CORRECTIVE ACTION REQUIRED
-
THERMALLY BROKEN CLADDING SUPPORT SYSTEM - INSTALLATION OF SYSTEM AS SPECIFIED IN THE SHOP DRAWINGS OR AS REQUIRED
-
CORRECTIVE ACTION REQUIRED
-
ALUMINUM WALL PANELS - INSTALLED WITH VERTICAL AND HORIZONTAL ALIGNMENT TRUE / PANEL DIMENSIONS MATCH SITE MEASURED CUT SHEETS / FASTENED AS PER ENGINEER'S REQUIREMENTS.
-
CORRECTIVE ACTION REQUIRED
-
METAL WALL PANELS - INSTALLED WITH VERTICAL AND HORIZONTAL ALIGNMENT TRUE / PANEL DIMENSIONS MATCH SITE MEASURED CUT SHEETS / FASTENED AS PER ENGINEER'S REQUIREMENTS.
-
CORRECTIVE ACTION REQUIRED
-
FLASHING - INSTALLED AS PER SHOP DRAWINGS OR AS REQUIRED
-
CORRECTIVE ACTION REQUIRED
-
CLEANING - WORKING AREA IS CLEAN AND ORGANIZED
-
CORRECTIVE ACTION REQUIRED
-
ELLISDON REPRESENTATIVE
-
FLYNN REPRESENTATIVE