Title Page

  • QA - Unitised

  • Canary Wharf, Southbank B1

  • Conducted on

  • Prepared by

  • Position

  • Location
  • Document No.

QA-Sheet Installation

  • Location

  • Floor/Level

  • Grid line Section

  • QA - Sheet Number

  • Unit Installation Date

  • Panel Nr.:

  • ID - Number:

  • Brackets torqued

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Horizontal gasket in good Condition

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Lined and Levelled

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Frame in good condition

  • Select date

  • Inspected OK

  • Select date

  • 140129-DR-

  • Damage repaired

  • Add media

  • Select date

  • 140129-NCR-

  • Damage repaired

  • Add media

  • Select date

  • Glass in good condition

  • Select date

  • Inspected OK

  • Select date

  • 140129-DR-

  • Damage repaired

  • Add media

  • Select date

  • 140129-NCR-

  • Add media

  • Damage repaired

  • Select date

  • Acoustic Sheet Bottom

  • Select date

  • Inspected OK

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Select date

  • Horizontal Firestop installed

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Finns Installed and fixed

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Breather Membrane applied and in good condition

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Insulation installed

  • Select date

  • Inspected OK

  • Select date

  • 2nd inspection

  • Date of 2nd inspection

  • Inspected OK

  • Membrane Air seal applied

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Internal Interface installed

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • External Cover Caps installed

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Horizontal Finn Joint sealed

  • Select date

  • Inspected OK

  • Select date

  • 2nd Inspection

  • Date of 2nd Inspection

  • Inspected OK

  • Protection applied

  • Select date

  • Inspected OK

  • Name:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.