QC - Inspection Report (Short)
-
Manufacturing Order #
-
Client
-
Inspector/Report prepared by
-
Location
Inspection
-
Product ID / SKU / Serial
FORMWORK
-
Inspection Date
-
Mould Conditions & Cleanliness (2.4)
-
FORMWORK Pass/Fail/Notes/Photos
-
Signature
POST-POUR
-
Inspection Date
-
Temp/Humidity
-
Face Mix (Colour, mix type + thickness) (Shop Drawing)
-
Backer Mix (Grade, thickness, etc...) (4.2)
-
Compaction (4.2.4)
-
Post-Pour Pass/Fail/Notes/Photos
-
Re-Inspection Date
-
-
Signature
FINAL QC
-
Final QC Inspection Date
-
Curing Period (eg. 7 days)
-
Surface finish, colour uniformity, cracks or spalls (Sample/Appendix B)
-
Product ID label attached
-
Final QC Pass/Fail/Notes/Photos
-
Signature
Final Sign Off
-
Is this product in an acceptable condition?
-
Auditor to sign here
Images
-
Add Photos