Title Page
-
Finished Product SKU
-
Conducted on
-
Conducted by
-
Site
-
Team Leaders Name
Line check
-
Line Leader Name?
-
Is there a product Specification on line for this SKU
-
Has the line Hygiene and Glass audit been completed
-
Has the line start-up sheet been completed and signed by another person
-
Is the line clean and tidy
-
Have the 30 mins line checks been completed on time
Shipper Build
-
Check the shipper is built as per the specifications
-
Is there a display shipper built for reference
-
Correct placement of SKU's in the shipper?
-
Count the number of units in the shipper is correct
-
List all Layerside codes used
-
Do these match with the specification
-
What is the lowest BB date
-
What is the date on the finished good ticket
-
Does this match the lowest BB date of the Layerside stock
-
Shippers banded / Wrapped / Correct Palletisation as per customer spec and build up plan.
-
Is the finished goods label matching the product spec?
-