Information
Basic information
-
Project name
-
Client
-
Project number
-
Paint manufacturer(s)
-
Corrosion protection work carried out by
-
Structure area
-
Estimated
-
Known
-
Constituent element area
-
Estimated
-
Known
-
Inspection area (if not A7 or A8) area
-
Estimated
-
Known
-
Drawing No.
-
Position No(s)
-
Sketch for identification of inspection area: if applicable, see attached drawing
Protective Paint System
-
Surface preparation, ISO 8503-1:
-
Surface profile (roughness), ISO 8503-1:
-
Substrate (e.g. steel, hot-dip-galvanized):
-
Prefabrication primer
-
Nominal (specified) dry film thickness (um):
-
Priming coat:
-
Nominal (specified) dry film thickness (um):
-
Intermediate coat:
-
Nominal (specified) dry film thickness (um):
-
Top coat:
-
Nominal (specified) dry film thickness (um):
Measurement/adjustment
-
Principle of measurement instrument:
-
Measurement instrument:
-
Serial no.:
-
Range of probe:
-
Calibration date
-
Date of measurement:
-
Adjustment:
-
Smooth surface
-
Rough surface
Acceptance/rejection criteria
-
Measurement:
Measurement
-
NDFT (Individual coat)
-
Cumulative coat
-
80% of Cum. NDFT
-
Max. Cum. DFT
Results
-
See Measurements Diagrams (Number of measurements taken acc. ISO-19840:2004 Claus 6).
-
Number of measurements:
-
Number of measurements between NDFT and 80% NDFT:
-
Percentage of those measurements compared with the total number of measurements:
-
Number of measurements less than 80% NDFT:
-
Number of repeated measurements:
-
Ambient temperature during the measurement:
-
Surface temperature during the measurement:
-
Remarks:
-
Work according the requirements?
-
Date:
-
Place:
-
Inspector name(s) (+stamp):
-
Signature(s):