Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
HEALTH AND SAFETY
SM1- Site Set Up/Signage/Traffic Routes *
-
Is Site Signage Displayed Correctly
SM2 - Protection of Public Maximum score of 1
-
Is the project area secured to preventing members of the public from entering the site
SM3 - Welfare Facilities/First Aid * Maximum score of 1
-
Hot/Cold Running Water etc.
-
Suitable Toilet Facilities
-
Eating Facilities etc.
-
Drying/Changing Room
-
First Aid Cover
SM4 - Documentation * Maximum score of 1
-
Safety Policy Displayed/Available/Up to Date
-
Accidents and Incident
-
Electricity Certification
-
Personnel Files
-
Toolbox Talks Given and Recorded
SM5 - Places of Work Maximum score of 0 - 5
-
Places of Work: Has the initial site set up plan been completed
SM6 - Risk Assessments/Method Statements
-
Are the Method Statements and Risk Assessments up to date. If any changes have been made then you should look for Management of Change Document.
SM7 - Training
-
Are all training records up to date also review training plans
SM8 - Working at Height
-
Please review all,WAH procedures and equipment used to work at height
SM9 - Crane/Trailer/Jacking/Skidding System
SM10 - Other Mobile Plant
-
Are all pre-operation checks being carried out?
SM11 - General Work Equipment
-
Is all working equipment inspected and maintained
SM12 - Lifting Equipment/Accessories
-
Is all lifting equipment be tested and certificates are available
SM13 - Control of Substances Hazardous to Health
-
Are the COSHH Risk Assessment available and communicated.
SM14 - PPE (Personal Protective Equipment)
-
Is All ALE required PPE available and used across the site, yard, projects
SM15 - Manual Handling
-
Is the a manual Handling Risk Assessment available
SM16 - Noise
-
has Noise Survey be completed
SM17 - Fire
-
Are fire exits and fire extinguishers available
SM18 - Safe/Secure Storage
-
Are containers for storing flammable containers available
QUALITY Maximum score of 1
QM1 - Project Review Completed *
QM2 - Customer Satisfaction Surveys
QM3 - Quality Policy Displayed and Available
QM4 - ALE Employee Hand Books Issued
QM5 - Approved Sub-Contractors Being Used *
QM6 - Site Documents * Maximum score of 1
QM6.1 - Management Review
QM6.2 - All Documentation Current Version
QM6.3 - Internal Audits
QM6.4 - Servicing and Maintenance Records
QM6 - Company Induction
ENVIRONMENT Maximum score of 1
EM1 - Environmental Policy Displayed and Available
EM2 - Pollution Prevention *
EM3 - Risk Assessment Completed
EM4 - Waste Management *
EM5 - Environmental Management Controls *
-
-
Select date
-
Auditors Signature