Information
-
Fire Name/Number
-
Evaluation No.
-
Conducted on
-
Task Force/Strike Team
-
Task Force/Strike Team leader
-
Prepared by
-
Location
-
Triage Category
- 1 needs no work safety zone present
- 2 needs some work safety zone present
- 3 needs a lot of work no safety zone present
- 4 rescue drive by
Safety Zones/Access
Check list
-
Needed Resources
-
Communications
-
Radio channels
Safety Zone
-
Safety zone Present
-
Distance from location
-
Safety Zone access and size
Location
-
Location type
Access
-
Access
-
Bridges
-
Heli Spot
-
Present<br>
-
Location
-
Size
- Type 1
- Type 2
- Type 3
- N/A
Access
-
Address visable
-
Driveway Condition
-
Driveway Length
-
Grade
Water Source
-
Water Source Present
-
Location
-
Volume in gallons
-
Draw site map
Structure
-
Subdivision
-
Number of structures
-
Primary
-
Roof
-
Roof litter
-
Siding
-
Siding condition
-
Decking and or stairs
-
Actions Taken
- Mitigation
- Gel
- Foam
- Sprinkler
- House wrap
-
Secondary
-
Roof
-
Roof litter
-
Siding
-
Siding condition
-
Decking
-
Additional Hazards
- Wooden fence with gate
- Wooden fence without a gate
- Fire wood more than 5m from structure
- Firewood pile on deck or beside structure
- Propane tank greater than 10m from structure
- Propane tank beside structure
- Some Yard litter little or no hazard to responders
- Some yard litter posing some hazard to responders
- large amount of yard litter considerable risk to responders
- Overhead Power
- Vent screen missing or larger than1/4"
-
Actions Taken
- Mitigation
- Gel
- Foam
- Sprinkler
- House wrap
Non combustible Zone 1A (0-5 ft)
Non- Combustible Zone 1A (0-5 ft)
-
Combustible vegetation
-
Slope
-
Aspect
Actions
-
- Mitigation
- Gel
- Foam
- Sprinkler
- House wrap
-
Notes
-
Add media
Zone 1 Veg (5-30+ ft)
Zone 1 Vegetation (5-30+ ft)
-
Combustible veg
-
Slope
-
Aspect
Actions
-
- Thin trees
- Limb Trees
- Clean up debris
- Dig Guard
- Setup hose lay
- Setup sprinklers
- Foam combustible veg
-
Notes
-
Add media
Zone 2 Veg (30-100+ ft)
Zone 2 Vegetation (30 - 100+ ft)
-
Combustible veg
-
Slope
-
Aspect
Actions
-
- Thin trees
- Limb Trees
- Clean up debris
- Dig Guard
- Setup hose lay
- Setup sprinklers
- Foam combustible veg
-
Notes
-
Add media
Trige Category
-
Category
-
Hazard assessment
0-25. Category 1
25-50. Category 2
50-75. Category 3
75-100. Category 4 -
Resource Request