Information

  • Document No.

  • Queensland Rail - Site Audit

  • Site

  • Conducted on

  • Prepared by:

  • Location
  • Personnel

General Details

  • Date:

  • Site Type:

  • Other:

  • Region / Rail Line

  • Other:

  • Site ID / Asset No:

  • Suburb:

  • Site Address:

  • Inspections Conducted Today:

Conduits - Surface

  • Add a Surface Conduit, Input the name and take a photo, trying to capture the Surface Conduit Identifier

  • Add a Surface Conduit

  • Surface Conduit
  • Name / Location

  • Photo of Surface Conduit

Surface Mounted Conduits

  • Type of Conduit Surface

  • Add Comment

  • Electrical conduits above ground level and/or accessible/Visible to the public are metal?

  • Conduits are stored in a safe manner that prevents damage due to external physical forces?

  • Conduits not UV rated are stored under cover to prevent solar damage?

  • Conduits are in good condition?

  • Take a Photo of the Conduit

  • All communication conduits installed visible and or accessible to the public and metal?

  • Conduit Colours represent type of service?

  • Where 2 different types of conduit are joined they are with a proprietary mating joint (preferably threaded) or suitable Junction Box?

  • Where it is unavoidable to have exposed PVC conduit at ground level and hat section has been constructed and installed?

  • Is hat section made of galvanised steel or stainless steel?

  • Is hat section painted to match the surrounding surface?

  • Is hat section secured?

  • Saddles are made of Metal?

  • Saddles are hot dipped Galvanised?

  • Saddles are double sided?

  • Saddles are spaced at maximum 400mm apart?

  • Screws and bolts are hot dipped galvanised?

  • Has a PVC priming fluid and cement been used to join conduits?

Conduits - Underground

  • Add a Underground Conduit, Input the name and take a photo, trying to capture the Underground Conduit Identifier

  • Add an Underground Conduit

  • Underground Conduit
  • Name / Location

  • Photo of Underground Conduit

General

  • Type of Conduit Underground

  • Add Comment

  • Is there no Corrugated conduit installed?

  • Conduit colours represent type of service?

  • Are conduits the size specified?

  • Are the correct number of conduits installed?

  • Have conduits been glued?

  • Conduits are stored in a safe manner that prevents damage due to external physical forces?

  • Conduits not UV rated are stored under cover to prevent solar damage?

  • Conduits are in good condition?

Laying Conduits

  • Are the conduits placed on the locations of the drawings?

  • Have the conduits been glued together (included a pre pipe cleaner on both conduits)?

  • Are there any HDPE conduits installed?

  • Are there any joins?

  • Have they been joined using an approved mechanical joiner or welded jointing system?

  • Are conduit runs of large smooth sweeping bends?

  • On main cable routes do bends not have a radius of less then 50m?

  • Are joins in conduits staggered as per spec?

  • Are conduits installed horizontally and vertically as per spec?

  • Have spacing materials between conduits such as wood been removed as bedding materials is compacted around?

  • Is there a minimum of 50mm bedding sand compacted on top of the conduits?

  • When a buried conduit does not end in a pit has it been sealed with a fitted cap and covered in sandbags?

  • Has the end of buried conduits been identified with a star picket and labelled or marked directly on the surface and on as constructed drawings?

Underground cable route marking and protection

  • Have underground cable routes been marked with PVC marker tape?

  • Are cable routes protected as per AS3000, less then 600mm clearance?

  • Is cable marking tape relevant to the service installed i.e. orange electrical cables and white communication cables?

Concrete Protection above conduits buried shallow

  • Shallow conduit locations?

  • Are conduits covered in concrete where required by AS 3000 due to depth of cover?

  • Is the concrete slab 100mm thick?

  • Does the slab cover the width of the trench?

Backfill

  • Does the backfill complies with the requirements of the site specification?

  • Is the backfill under a railway, roadway, car park?

  • Does it have 4% by weight cement stabilised?

  • Has the backfill been compacted as per spec?

Electrical Testing

  • Have test sheets been provided for all Circuits?

Mains and Submains

  • Have Test Sheets been provided for all Circuits?

  • Have insulation tests be carried out?

  • Has earth continuity been measured?

  • Are results low enough to allow circuit protection to operate?

  • Have polarity tests been carried out?

  • Has polarity been recorded on the switchboard legend?

  • Is the phase sequence the same throughout all mains and submains?

  • Have the test results been recorded and are the records available?

Insulation Resistance

  • Have all sub circuits been tested for insulation resistance?

  • Have all sub circuits passed minimum values?

  • Are there any values which may be legal but appear lower then expected?

  • Have the test results been recorded and are the records available?

Earth Continuity

  • Has earth continuity been carried out on all sub circuits?

  • Have all circuits passed minimum values?

  • Has any bonding been tested and passed?

  • Has the main earth electrode been installed, painted and a tag attached?

  • Take Picture of Main Earth Electrode

  • Has the traction earth bond been installed, painted and a tag attached?

  • Take Picture of Traction Earth Electrode

  • Have equipotential bonds been installed where required i.e. wet area slabs?

  • Take Picture of Equipotential Bonds

  • Have the test results been recorded and are the records available?

Fault Loop Impedance

Mains and Submains

  • Have all mains and submains been tested for FLZ?

  • Do the values comply with AS3000?

  • Did a RCD trip during testing?

  • Have all mains and submains been tested for short circuit impedance?

  • Have test results been recorded (including fault currents) and are the records available?

Subcircuits

  • Have all subcircuits been tested for FLZ?

  • Do the values comply with AS3000?

  • Did a RCD trip during testing?

  • Have all mains and submains been tested for short circuit impedance?

  • Have test results been recorded (including fault currents) and are the records available?

RCDs

  • Add RCD

  • RCD
  • RCD Circuit Number

  • Photo

  • Has RCD been tested with the push button?

  • Has each RCD been tested at 1x 5x 1/2 rated trip at 0 and 180 degrees?

  • IS the RCD type S and has it been tested to prove a non-actuating time of 180mS at rated trip current?

  • Is the RCD of a voltage independent type (VI):

  • Have the test results been recorded and are the records available?

Equipment and GPOs

  • General Equipment

  • Item
  • Photo of Equipment

  • Name / Location:

  • Type of Equipment

  • Other

  • Has the motor overload been adjusted to the Full Load Amperage?

  • Is motor direction correct?

  • Is the equipment the type specified in the design?

  • Is the IP rating appropriate to its location?

  • Have any penetrations into the equipment compromised the IP rating of the equipment?

  • Equipment Condition

  • Condition Comments

  • Take a Photo of the Equipment

  • Is the equipment support adequate?

  • Has the equipment been installed on a slab where required by design?

  • Is the slab thickness and reinforcement as per design?

  • Is the slab condition and finish of good quality?

  • Take a Picture of the Equipment

  • Is there an isolation device installed for this equipment as per design?

  • Is the isolation device rating high enough to handle full load current?

  • Is the isolator lockable as per design?

  • Is the isolator for gas hot water?

  • Does it break all active conductors?

  • Has protection and guarding been installed as per design?

  • Is the equipment appropriate for any external influences?

  • General Purpose Outlets (GPOs)

  • GPO
  • Photo of GPO

  • Name / Location:

  • Type of Equipment

  • Other

  • GPO Condition

  • Condition Comments

  • Take a Photo of the GPO

  • Is the GPO labelled as per the Design?

  • Is the GPO the type specified in the design?

  • Is the IP rating appropriate to its location?

  • Have any penetrations into the GPO compromised the IP rating of the GPO?

  • Is the GPO circuit protected by a RCD?

  • Is the GPO rated to any expected load?

  • Is the GPO in a Public Area?

  • Is GPO lockable or installed in an enclosure?

  • Is this GPO installed outside of restricted locations? e.g s damp areas?

  • Is this GPO installed outside of hazardous areas? e.g. near Gas cylinders?

Exit Inspection

  • Have all lights been installed as per design?

  • Are all the powerpoints installed as per design?

  • Is all equipment installed as per design?

  • Are all hat sections installed?

  • Is the general quality of the job neat and finished?

  • Are all pit/man hole covers installed?

  • Are as constructed plans and drawings relevant to the electrical system available?

  • Are lighting controls working as designed?

  • Are all circuits operational?

Labeling

  • Add a Label, Input the Details and take a photo, trying to capture the Labels identifier

  • Add Label

  • Labeling
  • Name / Location

  • Photo of Label

  • Are cable routes identified on pit lids?

  • Are cable routes identified every 50m and where cables change direction?

  • Do the markers identify the cable route and distance to the cable?

  • Are all multi-core and trefoil groups tagged at each end and crowded intermediate points with tags around each cable?

  • Labeling is adequate for all power points and light switches?

  • Labeling for light equipment follows QR nomenclature?

  • Are all switchboards labled?

  • Is all equipment labled?

Manholes and Pit covers

  • Manholes and Pit covers are legibly and permanently labelled to show the type of service (Electrical, Signals, Telecommunications or PA)

  • Are pits that have shared electrical service labelled SHARED ELECTRICAL?

  • Are all labels upper case, Arial font, have a minimum height of 20mm and be proportioned to suit the height?

  • Do the concrete covers have the appropriate text stamped into the casting?

  • Do galvanised steel/cast iron covers have an aluminium plate at 1mm thick, stuck to the cover with a minimum 4 aluminium pop rivets (dome head) and have the text stamped or engraved?

  • For station lockable lids are the letters approximately 20mm from the lockable lid access screw in line with the centre of the plate and orientated top to the centre plate?

  • Are the pit lids non slip?

Lighting - General

  • Add a General Lighting, Input the Details and take a photo, trying to capture the General lightings identifier

  • Add a General Lighting

  • Lighting - General
  • Name / Location

  • Light Number

  • Photo of General Lighting

  • Lamps that generate heat are seperated from flammable materials?

  • Is the lighting controlled?

Fluorescent Lights

  • Are the lights installed in the correct locations?

  • Fluorescent light numbers or locations?

  • Are the lights square with each other and other relevant edges?

  • Are the tubes the same colour?

  • Is the colour the type specified?

  • Are the lights they type specified?

  • Are the lights clean and free from damage?

Emergency lights

  • Emergency light numbers or locations?

  • Are the lights installed in the correct locations?

  • Are the lights the type specified?

  • Has a test switch been installed or facilities installed for remote testing?

  • Are lights stanilite RF nexus?

Reassurance lights

  • Emergency light numbers or locations?

  • Are the lights installed in the correct locations?

  • Are the lights the type specified?

Other lights

  • Recessed lights and their control gear are installed to prevent excessive temperature rise?

  • Roofs that have recessed lights have a warning sign at the access points?

Lighting - Towers

  • Add a Lighting Tower, Input the Details and take a photo, trying to capture the lighting tower's identifier

  • Add a Lighting Tower

  • Lighting - Towers
  • Name / Location

  • Tower Light Number

  • Photo of Lighting Tower

  • Are the tower lights the type specified?

  • Are the towers of tilt construction?

  • Will the towers tilt into an obstructions?

  • Will the towers maintain clearances to the overhead HV system?

  • Are the towers vertical and square?

  • Are the towers minimum 2.3m to the overhead HV system?

  • Do the towers feel of a sturdy design and installation?

  • Are the lights clean and free from damage?

  • Are the lights of the type specified?

  • Are the towers installed as per design?

  • Are the conduit entries sealed to prevent water and vermin entry?

  • Are isolation devices installed on equipment tray where required?

Lighting - Tower Footings

  • Add a Tower Footing Light, Input the name and take a photo, trying to capture the Identifier

  • Add a Lighting - Tower Footing

  • Lighting - Tower Footing
  • Name / Location

  • Photo of Lighting - Tower Footing

  • Tower light numbers?

  • Are the footings installed to the size and depth specified?

  • Are the footings located as per design?

  • Is the cage installed the correct type?

  • Is the conduit installed in the footing?

Manholes and Pits

  • Add a Manhole or a Pit, Input the name and take a photo, trying to capture the Manhole / Pit's Identrifier

  • Add Manhole / Pit

  • Manhole / Pit
  • Name / Location:

  • Photo of Manhole / Pit

  • Has the Pit been installed at the location as specified on the most current plan?

  • Has the Pit been installed square to any adjacent fence, railway track or station platform face with the lid opening away from the railway track?

  • Pit foundations have been made by sacrificing 150mm under the pit and compacted as per specifications?

  • Does the pit have drainage install?

  • Before backfilling around a pit or manhole has the inside been propped to prevent cave ins or warping?

  • Do conduit entries (knock outs) not in use face the railway track as spaced?

  • Is the pit not installed in station platforms and car parks horizontal and set 50mm above finished ground level?

  • Is there 400mm of selected back fill surrounding the pit, compacted and tapered?

  • Is the pit and manhole installed in station platforms and car parks flush with the finished surface level?

  • Manhole / Pit fitted with a cover capable of withstanding the load applicable to the class nominated on the draws or specification?

  • Full clear access to the pit as been maintained?

  • The cover frame is permanently attached to the top (multipart covers acceptable)?

  • The cover is at the same level of the surrounding ground unless shown otherwise in the drawings?

  • If specified otherwise what is the height difference to the surrounding ground level?

  • Covers can be opened comfortably by one person?

  • Have Covers have been fitted with a mechanism for attachment of a mechanical lifting device?

  • Is the pit deeper then 1200mm?

  • Is the pit installed with a ladder as required by clause?

  • Steps are parallel to the wall of the man hole or pit?

  • Steps have a minimum clearance of 200mm for the centre rung to wall of the pit?

  • Cable and conduit entry's are incorporate through the walls to meet cable/conduit route requirements?

  • Conduits installed into the pit or manhole have an appropriately coloured bell mouth fitting installed as close to the pit wall as possible?

  • If no are conduits installed into the pit maximum 30mm(+-10mm) with smooth chamfered, non sharp edges?

  • Are bell mouths and conduit entries sealed to the pit or manhole with an epoxy mortar compatible with the conduit and the pit?

  • Are all gaps around bell mouth ends filled and smoothed out with epoxy mortar?

  • Concrete on exposed walls is smooth with no sharp protrusions to prevent injury?

  • Polyethylene pits have a concrete surround in areas where they may be subject to deformation DRSL 3.3?

Pit and Conduit Testing

  • Add a Conduit, Input the name and take a photo, trying to capture the Conduits Identifier

  • Add Conduit

  • Conduit
  • Name / Location

  • Photo of Conduit

Pits and Manholes

  • Have the pits and manholes been cleaned?

  • Has the grouting been finished?

  • Has sharp edges been removed within the pit?

  • Have conduits been bevelled?

Mandrel Testing

  • Has a mandrel of 240mm long and 95% nominal diameter of the conduit been used for the test?

  • Did the mandrel pass freely in both directions of the conduits?

  • After testing, were the main cable route conduits sealed effectively with polystyrene plug/bung?

Draw Ropes

  • Have draw ropes have been installed in all conduits between each manhole and cable pit?

  • Are draw ropes a suitable type (non stretch, min 3 strands, moisture resistant, polypropylene) for pulling cables?

  • Do draw ropes extend at least 1.5m into each pit, and are secured to prevent being pulled or washed back into conduits?

  • Are the joins in draw ropes the same strength as the rope, and do not appreciable increase the size?

  • Have draw ropes been installed after mandrel testing where required?

Switchboards

  • Add a Switchboard, Input the Details and take a photo of the Switchboard

  • Add Switchboard

  • Switchboards
  • Switchboard Number

  • Plant ID Number

  • Location Details

  • Fed From

  • Other Supplies

  • Clear Access?

  • Switchboard Brand

  • Other

  • Earthing System

  • General Comments

  • Photo of Switchboard

General Conditions

  • Is the switchboard energised?

  • Has protection against exposed live parts been maintained i.e insulation and enclosures?

  • Is the switchboard anchored in position and/or supports in good condition?

  • Does the switchboard maintain minimum clearances?

  • Has the switchboard been installed not in a restricted area?

  • Are the doors free and open to 100 degrees?

  • Is the switchboard anchored in position and/or supports in good condition?

  • Is the switchboard free from rust and damage?

  • Is the switchboard generally clean?

  • Are the neutral and earth bar accessible and free from obstructions?

  • Isolation links and active links installed as per design?

  • Has the identifcation and labelling of equipment been installed ie bus insulation, markings, wireing tags , MEN, traction?

  • Are spare poles covered with pole fillers?

  • Is the board exposed to the weather?

  • Is the board rated to IP56?

  • Is the water proofing free from damage and age?

  • Are entries sealed to prevent ingress from water?

  • Does the switchboard latches operate?

  • Does the lock system work?

  • Do all indicators and meters work?

  • Are there signs of vermin inside?

  • Are there any conditions in this board that would create a higher then normal danger to maintenance staff or the public?

  • Is arc fault protection as per specification?

  • Are isolation devices such as main switch's as per design?

  • Has the integrity of the switchboard been compromised?

Busbar / Chassis

  • Does the busbar / chassis insulation show signs of stress and/or cracking?

  • Is the busbar clear from other arcing hazards?

New Switchboards

  • Is the switchboard mounted in an external location?

  • Is the switchboard rated IP56?

  • Made from stainless or powder coated aluminium?

  • Does the switchboard maintain minimum clearances?

  • Is the switchboard used to feed public service areas?

  • Can it be accessed 24hours a day by maintenance staff without entering station staff only areas?

  • Is the switchboard in a restricted location?

  • Is the switchboard located internally or in a water proof cupboard

  • Is the switchboard rated to at least IP54 and made from powder coated mild steel or better?

  • Are the doors and metering panels secured with a 3 point latching system keyed with a QR B2 key?

  • Is the switchboard is in a public area

  • Are the handles and lock semi flushed?

  • Are the handles locked via a padlock?

  • Is the switchboard fitted with a main isolator?

  • The main switch/isolator and other controls are not to be interlocked with the door/escutcheon to restricted access to busbar and chassis when energised?

  • In a chassis style board is there a neutral and earth bar on both sides?

  • Can the chassis CB poles be isolated individually as per?

  • Does the board have a minimum width of 800mm for 24poles + and 600mm for boards less then 24?

  • Main switchboards require primary surge protection and secondary on sensitive equipment. Does this board comply?

  • Does the board 50% spare poles for boards less then 36poles and 30% for boards greater then 36 poles?

  • Does the switchboard pole number match the circuit neutral and earth bar numbers?

  • Does all equipment in public areas and lighting have 30mA RCD protection?

  • Are car parks supplied off station supply and sub metered?

  • Are all internal cables including earth identified with a cable sleeve linked to the appropriate circuit number?

  • Is the top switchboard free from penetrations?

  • Does the switchboard have a typed laminated legend that includes all details from?

  • Any new CER DB requires facilities to connect a temp generator i.e. inlet and change over switch) Does this board comply?

Legend

  • Does the switchboard have a legend?

  • Does the legend identify all circuits?

  • Is the legend accurate and up to date?

  • Are circuits that supply emergency lights labeld as per requirements?

  • Does the legend identify neutral numbers?

Circuit breakers, RCDs and RCBOs

  • Are the correct CB rating installed as per design?

  • Are the correct CB KA rating installed as per design?

  • Have RCDs been installed on the correct circuits?

  • Does the CB suit the board?

  • Do the CBs all toggle on and off in in the same orientation?

  • Are CBs and RCDs set up to allow discrimination?

  • Are all the CBs the brand specified?

Wiring systems

  • Are cable looms neat and supported where required?

  • Are cables protected and entry/exit points?

  • Are cables damaged in anyway?

  • Are correct colours used?

  • Disconnected cables and covered?

  • Disconnected cables and identified?

  • Are cables free from sharp objects and corners?

  • Are cables sized as per spec inc mains?

  • Has the main neutral been identified and labelled?

  • Has the supplied/main earth been identified and labelled?

Switchboard - Direct Earthing

  • Add a Switchboard Earthing with RCD, Input the Details and take a photo

  • Add Switchboard Earthing with RCD System

  • Switchboard - Direct Earthing
  • Location

  • Fed From

  • Other Supplies

  • Clear Access?

  • Switchboard Brand

  • Other

  • General Comments

  • Photo of Switchboard Earthing with RCD System

  • Is there no connection between the Energex earth system and the direct earth system?

  • Is the earth not bonded to the neutral (no MEN)?

  • Is the main/supplied earth identified?

  • Is the earth stake and clamp in good condition?

  • Is the tail to the earth in good condition?

  • Is the traction bond identified and connected?

  • Is the traction bond the size specified and no smaller then 16mm Cu?

  • Is the traction bond point locations identified at the board?

  • Is there a S type RCD with 300mA-500mA rating feeding this board or an upstream board?

  • Is the RCD of a voltage independent type (VI)?

  • Is the switchboard labelled to indicate the it has a direct earthing system?

Switchboard - Energex Earthing

  • Add a Switchboard earthing Energex system, Input the Details and take a photo

  • Add Switchboard earthing Energex system

  • Switchboard - Energex Earthing
  • Location

  • Fed From

  • Other Supplies

  • Clear Access?

  • Switchboard Brand

  • Other

  • General Comments

  • Photo of Switchboard earthing Energex system

  • Is the switchboard outside of the traction earthing zone?

  • Is the main/supplied earth identified?

  • Is the tail to the earth clamp in good condition?

  • Is the earth stake and clamp in good condition?

  • Has the tail to the earth stake been sprayed with Zinc?

  • Is the MEN installed?

  • Is the earth bar secure?

  • Is he earth bar accessible?

  • Is the switchboard earthed where required?

Switchboard - IsoTX Earthing

  • Add a Switchboard Earthing Traction IsoTx system, Input the Details and take a photo

  • Add Switchboard Earthing Traction IsoTx system

  • Switchboard - IsoTX Earthing
  • Location

  • Fed From

  • Other Supplies

  • Clear Access?

  • Switchboard Brand

  • Other

  • General Comments

  • Photo of Switchboard Earthing traction IsoTx system

  • Has the MEN connection been installed in the switchboard supplied off the secondary of the transformer? (Note the MEN must not be installed at the terminal block inside the transformer)

  • Is the TX installed within the traction zone?

  • Is the supply protected with an S type RCD?

  • What class is the TX

  • Add Comment

  • Is the RCD of a trip rating not exceeding 500mA?

  • Has the TX been tested 1000v phase to earth and recorded?

  • Is the RCD voltage independent type (VI)?

  • Has the TX been installed more then 2.5m away from any other different earthing system or insulated?

  • Has the TX been installed as per the plan?

  • Has the TX been earthed as per design?

  • Has the earth stake been installed as per design?

  • Are earth cables the correct size?

Trenching

  • Add a Trench, Input the name and take a photo, trying to capture the Trenches Identifier

  • Add Trench

  • Trench
  • Name / Location

  • Photo of Trench

Trenching

  • When the trench alignment is nominated on the drawings are the trenches within 100mm?

  • Do the trenches alignments allow for pits to be no closer then 1400mm to the outside edge of the platform?

  • Do the trench depths allow the minimum covers from the conduits as shown on the drawing?

  • Are the conduits expected to be covered with concrete as per AS3000 and QR specs?

  • Do the shallow trenches have location markers on appropriate pit lids wording WARNING SHALLOW CABLE DEPTH

  • Do the trench widths allow 50mm clearance between conduits and trench walls?

  • Is shoring of the trench required as per?

  • Has Shoring been installed

  • Has trenching been done in an existing paved surface

  • Has the surface been pre cut to minimise reinstatement work?

  • Is excavated material places well clear to prevent material falling back into the trench?

  • Are there any trenches on station platforms?

  • Who has been communicated with about the work (i.e. station staff, inspectors)?

  • Is the work area acceptably barricaded off to the public?

  • Are unattended trenches bordered over?

  • Is the work being done outside peak hours?

  • During darkness are barricaded areas provided with an acceptable level of lighting?

  • Is the work being done, backfilled and concreted without delay to avoid inconvenience to the public and staff?

  • Is the trench length being kept to a minimum, generally 1 conduit length or 5m where practicable in public areas?

Bedding

  • Does the bottom of the trench have a minimum 50mm of suitable compacted bedding material?

  • Is bedding material free flowing gravel, loam, sand or a mixture there of free from sharp angular stones, soluble salts, organic matter and other deleterious matter?

Wiring Installations

  • Add a wiring installation, Input the Details and take a photo, trying to capture the wiring installations identifier

  • Add a Wiring Installation

  • Wiring Installations
  • Name / Location

  • Photo of Wiring Installation

  • Cable sizes are to design?

  • Cables are of correct type of insulation?

  • Cables are segregated from other services such as gas and comms?

  • Cables are protected from external influences such as UV and mechanical damage?

  • Cables in conduits more then 2m have adequate support for the weight?

  • Cables are the correct colour (p40)?

  • Enclosures and J-boxes are in good condition?

  • Joins in J-boxes are suitably terminated?

  • Have any joins been made in newly installed cables?

In tray or ladder

  • Cables appear undamaged?

  • Cables are installed neatly in tray or ladder?

  • Cables are cable tied at suitable intervals?

  • Cable ties are generally cut cleanly and short to prevent injury?

  • Cables are protected from sharp edges where required?

  • Cables are not excessively bunched?

  • Single 3phase cables are layed in trefoil style?

  • Tray or ladder is not overloaded?

  • Have any joins been made in newly installed cables?

In Roofs

  • Cables appear to be undamaged?

  • Cables are clipped or supported where required?

  • Cables are not run over the top of trusses except within 600mm of the edges of the roof?

  • Cables are installed in a neat manner?

  • LV cables are segregated from communication cables?

  • Cables are protected from sharp edges where required?

  • Cables are not run close to sources of excessive heat that may cause damage or a fire risk?

  • Cables are run in a matter that will not cause excessive de-rating?

  • Joins in cables are made in a jbox?

  • Cables are clipped near manholes?

  • Have any joins been made in newly installed cables?

Miscellaneous Observations

  • Observations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.