QS Desktop Review
-
Select relevant sections below to be completed. Those not applicable to this review, please select 'Not Applicable'
-
1.0 Basic LINK Use
-
1.1 Is the form of contract listed?
-
1.2 Are all subcontractors listed as external contacts?
-
1.3 Is the QS listed as an internal contact?
-
1.4 Is version control being used?
-
Cost Plans, CVC docs etc should not have multiple documents saved, only one using version control.
-
1.5 Has an RFI tracker been populated?
-
1.5A Is this saved in pool 05.10.03?
-
1.5B Are there any outstanding RFI's showing that are overdue?
-
1.6 Are there any unresolved commercial risks detailed in the risk register?
-
2.0 Subcontract Enquiry Quality
-
2.1 Have all enquiries been issued via SCT?
-
2.2 Are the documents issued via SCT relevant to each package?
-
Drawings, scope and information issued should be specific to each package, not just a bulk upload and issue of all documents.
-
2.3 Has a programme of works or phasing plan been issued out with the enquiries?
-
2.4 Are the working pattern expectations detailed within the enquiry?
-
2.5 How long have we allowed for subcontractors to return a quote?
-
2.6 Has a BoQ or SoW been issued as part of the enquiry?
-
2.7 Is the basis of return clear? (i.e. fixed price or remeasureable)
-
3.0 Subcontractor Engagement
-
3.1 Is the procurement tracker up to date?
-
3.2 Is the procurement tracker stored in LINK under 05.07.02 & 05.15.01?
-
3.3 Have tender review meetings occurred for all relevant subcontractors?
-
To be completed for subcontractors with orders of £10k or if a new subcontractor. This should be signed by both parties and issued out as part of the subcontract order.
-
3.4 For lower value orders, do the basis of these reflect our contractual basis? (i.e. fixed price or subject to remeasure?)
-
3.5 Have notes been completed on Evision for orders under £50k?
-
3.6 Is there a record in LINK or Evision of the order being issued to the subcontractor?
-
3.7 Is there any evidence of feedback being given to subcontractors once a package has been successfully let?
-
4.0 Subcontractor Orders
-
Pick 3 subcontractors for the below questions. List chosen subcontractors here
-
4.1 Has the subcontract order been raised in line with HB/Client agreement and as per the original enquiry? (i.e. fixed price or remeasureable)
-
4.2 Does the subcontract order make reference to the Principal Contractor and Client?
-
4.3 Does the order include specific start and finish dates
-
4.4 Have insurances requirements been listed?
-
4.5 Have payment terms been noted in the order?
-
4.6 Has information on retention including % and dates been recorded?
-
4.7 Has a value been included in the LAD's?
-
4.8 Have attendances been listed?
-
4.9 Have warranty/product guarantee requirements been listed?
-
4.10 Have valuation dates been populated and issued with the order?
-
4.11 Is there evidence that relevant documents have been issued with each order? (this includes Subcontract Tender Review minutes, POW, and order schedules)
-
5.0 Change Control
-
5.1 Are subcontract variations/instructions to subcontractors visible in LINK? (05.15.06)
-
5.2 Is there evidence that weekly change control has been implemented (05.05.07)
-
5.3 Is there an adequate level of detail within the change control document? (05.05.07)
-
5.4 Is there evidence of instructions being returned for variations (AI's, CMI's) (05.05.07)
-
5.5 Is there evidence that changes are being agreed as works progress? (05.05.07)
-
6.0 Applications for Payment
-
6.1 Is there evidence that subcontractor applications have been received, added to the application log and published to LINK? (05.15.05 & 07.03)
-
6.2 Are we holding subcontractors to payment terms? (05.15.03 as per order)
-
6.3 Is there evidence that valuation dates have been agreed with the PQS/Client? Do these align with the dates in Schedule 1 of the subcontract orders? (05.05.01)
-
6.4 Is there evidence that applications for payment have been issued in line with the application schedule? (07.03 application log)
-
6.5 Comparison of applied value against certified value, is there any cause for concern? (05.15.04 payment notice)
-
6.6 Is there evidence of what has been agreed for each application and certified for invoicing? (05.15.04 payment notice)
-
7.0 Payment Notices
-
7.1 What level of detail has been included against our assessment of subcontractor applications? (05.15.04 breakdown or payment notice)
-
7.2 Have payment notices been issued in good time? (07.03 application log)
-
7.3 Are we reflecting final account payment notices as 'final' or are these marked as interim? (05.15.04 payment notice)
-
7.4 Is there evidence that final account statements are being issued for subcontractors with variations? (05.15.07)