Information

  • Document No.

  • Inspection Address

  • Client / Site

  • Conducted on

  • Conducted By (If 'Other' please insert below)

  • If Conducted by 'Other' Please Insert Name

QUALITY INSPECTION

  • Date:

  • Day:

  • Site Inspection

  • Visit

INSTALLATION DETAILS

  • Installation Address

QUALITY INSPECTION

  • Are all works compliant to Specification?

  • What is the condition of the 1st Fix Wiring

  • What is the condition of the 2nd Fix Installation

  • Have you checked the Accessory Heights?

  • What is the Condition of the Fuse Board?

  • Are all Labels and Circuit Information present and located correctly on the Fuse Board?

  • Are all Labels and Circuit Information present and located correctly on the Fuse Board?

  • Has RCD Protection been Installed?

  • Confirm Main Earth & Incoming Services Bonded?

  • Adequate Cross Bonding Installed?

  • Check the Actual Test Certificate against the Installation...Confirmation that the test Certificate is correctly completed is required.

  • PHOTOGRAPHIC EVIDENCE IS TO BE TAKEN IN ALL CASES.
    EVIDENCE OF GOOD AND POOR QUALITY MUST BE PROVIDED.

PHOTOGRAPHIC EVIDENCE

  • Evidence of Poor / Good Installations

  • Insert
  • Evidence

INSTALLING ELECTRICIAN(s)

  • Insert Name

  • ALL INSPECTIONS MUST BE EMAILED EACH DAY TO THE OFFICE WHERE THEY ARE TO BE STORED ON THE COMPANY SERVER.

    THE REPORTS WILL BE REVIEWED BY SENIOR MANAGEMENT ON A WEEKLY BASIS.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.