Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Crew/Individuals Performing CFS Framing and Erection
-
Provide crew or individual's name(s) that performed/overseen the framing and detailing of the structure.
Roof Uplift Holdown Strap Installation
-
Are all "Roof Uplift Connections" applied as per details 1,3+4/CF400?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Joist Alignment Over E2 walls and Wall Top Track Connection to Bottom of Joist
-
Is joist aligned and fastened to top of walls per detail 3/CF400?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
G2 Girder Angle Clip Connection from Cantilever Rim-Channel to G2 Web
-
Is the rim-channel attached to cantilevered G2 girder with clip angles as per elevation 2/CF201?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Joist Block Installed in the 1st Interior Joist Bay near the Mid-point of the E2 Walls
-
Is joist blocking provided above the exterior walls as per plan and applied per detail 5/CF400?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Kitchen Roof Uplift via Angle Clips in lieu of Flat Strap
-
Were clip angles applied below the kitchen roof as per detail 2/CF401?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Cantilever Joist Web Stiffeners
-
Do all cantilevered joist have web stiffeners applied per detail 2/CF400?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Back-to-Back Rim-Channel Cantilever Angle Clip Seat where there is a Bearing Gap
-
Were clip angles applied at top of wall below cantilevered back to back rim track to close the gap as per details 3+6/CF400?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Wall Bottom Track Connections to Foundation at Studs and Jambs
-
Are the bottom wall tracks fastened to the foundation at specific locations as per detail 1/CF500?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Sheathing Fasteners to all Posts & Jambs in addition to O.C. Studs and Cripplers
-
Are the exterior and interior sheathing materials fastened to the CFS structure per detail 4/CF501?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Post Holdown Brackets and Concrete Anchors
-
Are all post holdown brackets applied and anchored to the foundation as per details 2+3/CF501?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Direct Fasten Metal Roof Fasteners and Fastener Pattern
-
Is the metal roof direct fastened to the roof framing members as per detail 1/CF501?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
General Delivered Cold-Formed Steel Material Type, Thickness, and Galvanizing or Painting for Studs, Joist, Track and Metal Roof Deck
-
Are Cold-Formed material type, thickness, galvanization, and paint thickness certifications available for stud, track and metal roof deck?
-
Engineer's comments.
-
Photo of corrective actions to resolve issue (as needed)
-
Resolution comments (as needed)
Quality Control Inspection Sign-off:
-
Inspection Completed by: