Information
-
Job number
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Type of works
-
Type of traffic control being used
- 2 way Lights (40mph and below)
- 2 way Lights (50mph and above)
- Multiphaze Lights (40mph and below)
- Multiphaze Lights (50mph and above)
- Static Stop/go (40mph and below)
- Static Stop/go (50mph and above)
- Mobile Stop/go (40mph and below)
- Lane Clousure (30 mph)
- Lane Clousure (40 mph and above)
- Road Closure and Diversion
- Road Clousure, No Diverion
- Pedestrian management
- Convoy Works
-
Are operatives carrying their lantra cards/certification/slg card?
-
Operative briefed on latest Safety Alert/Toolbox talk?
-
Do all members have the correct PPE for this site, and is it in good condition and presentable?
-
Are RA/MS available on site and are they in good condition and up to date?
-
Has all site paperwork been issued, signed and is it relevant and correct for the works being carried out
-
Where there any site specific instructions issued and are they being carried out
-
What where the site staff doing when you arrived?
-
Have the vehicle checks been completed, are there any issues and is the vehicle in a good and presentable condition?
-
Does the site comply with the relevant drawing, RA/MS, ACOP, and chapter 8?
-
Are all signs secured, footways clear, and drives and junctions clear of obstructions?
-
What was the general state of the traffic management equipment/ system being used?
-
Where the operatives briefed correctly by the operations team, is the information suitable for the site and is there anything that can be improved upon
-
HSQ Conversation: Ask the operative for feedback regarding health and safety, safety and quality of site and equipment including the information supplied to them (VFL)
-
Environmental assessment of site. Has an environmental assessment been carried out for this site, and was one required?
-
Is the customer happy with the service supplied so far? (Please provide customer feedback)
-
Add media
-
Add signature
-
Add signature