2.0 Public Areas
-
2.1 All Containment Works
-
2.2 Incoming Service Position
-
Rectified during audit?
-
2.3 Site clean & tidy after all works completed
-
Rectified during audit?
-
2.4 Existing Incoming Cutout Left in Good Condition and Sealed
-
Rectified during audit?
-
2.5 Meter Tails Marked
-
Rectified during audit?
-
2.6 MSU Sealed & Padlocked
-
Rectified during audit?
-
2.7 SP Label Fixed To MSU
-
Rectified during audit?
-
2.8 Cable Glands On MSU Fixed Tight
-
Rectified during audit?
-
2.9 Service Cable to Flats Clearly Marked
-
Rectified during audit?
-
2.10 Cable Trunking Tidy, All Lids & Bolts Fixings Tight With Danger Live Label Attached
-
Rectified during audit?
-
2.11 All Drilled Holes Filled with Fire Foam
-
Rectified during audit?
-
2.12 Hallways Tidy and Clean (Handrails, Window Sills & Ledges)
-
Rectified during audit?
-
2.13 Individual Service Position Clean Tidy and Cut-Out and Meter Sealed
-
Rectified during audit?
-
2.14 Plastic Trunking Within Flat Tidy And Secure
-
Rectified during audit?
-
2.15 Three Phase / Single Phase cutout changed completed
-
Rectified during audit?
-
2.16 Wood Containment & Painting completed
-
Rectified during audit?
-
2.17 Meter Cupboard / Cubicle Built
-
Rectified during audit?
-
2.18 Existing Incoming cutout left in good condition and Sealed
-
Rectified during audit?
3.0 Works Carried Out
-
3.1 Number of Cut Outs
-
3.2 Metres of Cable
-
3.3 Bemco(s) Labelling
-
3.4 Service Position Labelling
-
3.5 Testing Certificates
-
3.6 Completion Pack – Local Authority
4.0 Non- Conformance Summary
-
4.1 Corrective Action
-
4.2 Date:
5.0 General Comments
-