Information
-
Audit Title
-
Document No.
-
Site
-
Conducted on
-
Prepared by
-
Location/Address
-
Personnel
Site overview
-
Principal Contractor
1. Scaffold Documentation
-
1.1 Scaffolders RAMS. Are they site specific and relevant? Are the RAMS held on site and signed by all scaffolders?
-
1.2 reference made that all Scaffolders will work to SG:4 ?
-
1.3. All Scaffolders CISRS carded & inducted by the Principal Contractor.
-
1.4 Adequate scaffolders rescue plan documented and appropriate equipment held on site?
-
1.5 Reference made to TG:20 ?
-
1.6. Scaffold design drawing No:
-
1.7. Pavement licence in place?
2. Scaffold Base Lift
-
2.1 Ground conditions/Footings/Base plates/Sole plates
-
2.2 Standards vertical and bays no larger than 2m?
-
2.3 Ledgers horizontal and not to exceed 2m (pavement lift no greater than 2.7m)?
-
2.4 Transoms horizontal max spacing 1.2m ?
-
2.5 Facade Bracing every 5 bays ?
-
2.6. Scaffold Tubes and Fittings in good condition ?
3. Working Lifts ?
-
3.1 Scaffold Boards in good condition not spilt (BS 2482:2009), inner boards clipped/secured?
-
3.2 Hand Rails 950mm & intermediate guard rails 470 mm ?
-
3.3 Brick guards & toe boards ?
-
3.4. Ledger Bracing ?
-
3.6. Working platform clear of debris and materials ?
-
3.7. Scaffold Tubes and Fittings in good condition ?
-
3.8. Transoms horizontal max spacing 1.2m ?
-
3.8. Plan Bracing ?
4. Scaffold Ties
-
4.1. Scaffold ties conform to TG:20 or scaffold design ?
-
4.2. Scaffold Ties ?
-
4.3. Scaffold Ties ?
-
4.4. Scaffold Ties ?
-
4.5. Scaffold Ties ?
9. Ladders
-
9.1 Ladders.
-
9.1 Ladders.
-
9.1 Ladders.
10. Stairs
-
10.1. Stairs
-
10.2. Stairs
-
10.3. Stairs
11 Loading Bays
-
11.1 Loading bays.
-
11.2 Loading bays.
-
11.3. Loading bays.
12. Hoists
-
12.1. Enclosure
-
12.2. Platform and cage.
-
12.3. Machinery
-
12.4. Structure and ties.
-
12.5. Other
13. Rubbish Shoots.
-
13.1. Rubbish Shoots. .
-
13.2. Rubbish Shoots.
-
13.3. Rubbish Shoots. .
14. Other
-
14.1 Other
-
14.2 Other
-
14.3 Other
Summary
-
Safety Advisor
-
I agree that a copy of this report has been given to me and that corrective actions has been taken or will be taken to rectify those items
-
Site Representative
-
I confirm that all actions highlighted within this report have been completed
-
Contracts manager name signature and date