Title Page

  • Prepared by

  • Signature

To be completed by Maintenance: PM Checklist

To be completed by Maintenance: PM Checklist (Please clarify in notes for any comments)

  • Filler: Visual inspection, Check for any damages or leaks: Supply/Delivery hoses and the product delivery tubes.

  • Filler: Flushing out the filler with warm and soapy water

  • Filler Sterilization: Disassemble Filler and Sterilize: Filling Manifold and Filling Nozzles.

  • Filler Silicone Tubes Replacements: Replace all the Silicones Tubes with new ones.

  • Filler Pump Rebuilding: Disassemble Filler Pump, replace (Seals, Diaphragms) and Lubricate pistons with food grade grease ("SUPER LUBE" MULTI-PURPOSE SYNTHETIC GREASE).

  • Air pressure regulators: Check air pressures: (70 psi for Pinch Bar, 60 psi for Pump).

  • Air pressure filter: Drain water separator.

Notify QA and Sanitation that PM is completed

  • Notify QA that PM is completed - it is their discretion whether any additional swabbing/sampling is required.

  • Is the sanitation team required for cleaning prior to production?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.