To be completed by Maintenance: PM Checklist
To be completed by Maintenance: PM Checklist (Please clarify in notes for any comments)
-
Filler: Visual inspection, Check for any damages or leaks: Supply/Delivery hoses and the product delivery tubes.
-
Filler: Flushing out the filler with warm and soapy water
-
Filler Sterilization: Disassemble Filler and Sterilize: Filling Manifold and Filling Nozzles.
-
Filler Silicone Tubes Replacements: Replace all the Silicones Tubes with new ones.
-
Filler Pump Rebuilding: Disassemble Filler Pump, replace (Seals, Diaphragms) and Lubricate pistons with food grade grease ("SUPER LUBE" MULTI-PURPOSE SYNTHETIC GREASE).
-
Air pressure regulators: Check air pressures: (70 psi for Pinch Bar, 60 psi for Pump).
-
Air pressure filter: Drain water separator.
Notify QA and Sanitation that PM is completed
-
Notify QA that PM is completed - it is their discretion whether any additional swabbing/sampling is required.
- Notify QA that PM is complete - QA can decide whether any additional swabbing/sampling is required.
-
Is the sanitation team required for cleaning prior to production?
- Notify Sanitation that PM is completed and cleaning is required
- Maintenance performed necessary cleaning
- No additional cleaning required