Title Page
-
Conducted on
-
Prepared by
Report
1. WEATHER
-
Degrees (F)
-
Conditions
- Sunny
- Cloudy
- Partly Cloudy
- Snow
- Rain
2. MANPOWER
-
Indicate TOTAL number of personnel on that site for that day INCLUDING subcontractors
-
number
2.1 Contractor (HFH)
-
Project Manager - Tara Duvivier
-
Site super
-
AC
-
Volunteers
2.2 Subcontractors
-
Plumbers
-
Windows -Top Craft
-
Roofers
-
Foam Insulation
-
Electrical BDS Electric etc
-
Tapers
-
Concrete
-
Siding
-
Iron Workers
-
Masons
-
stairs
3. WORK
-
Work performed today
-
Pictures of work
4. ISSUES
-
Current Issues - with tools, equipment, transportation, construction materials, orders, deliveries, RFIs or other
-
Pictures of current issues
-
Predictable Issues
-
Pictures of predictable issues
5. DAILY PHOTOS
-
Include one frontal and one side view of the entire structure from across the street. Include, minimum, one long shot of each floor including attic space and basement.
6. SAFETY
-
Are all safety protections in place today?
-
-
What safety protections were not in place?
-
Picture of failed protection
7. COMMENTS/REMARKS
-
Add media