Title Page
-
Site conducted
-
FM-0361
-
Conducted on
-
Prepared by
R2 Chamber CIP Preparation Checklist
-
Time Started:
-
Time Completed:
R2 Chamber CIP Pre-Operational Inspection Checklist
-
-
Date:
DOME - TO BE DONE PRIOR TO BLOW DRYING
-
Inspect and clean inside of Venturi
-
Task completed by:
-
Remove whirly birds (2) and place clean inserts (2) back in. ATP swab inserts (2)
-
ATP swab results:
-
Task completed by:
-
Dryer inserts (2) are clean and sanitized prior to reassembly. ATP swab inserts (2)
-
ATP swab results.
-
Task completed by : Initials
-
Enter dryer inlet plenum with full body coverall, hand dry and sanitize expansion joint
- Compliant
- Non-Compliant
-
Task completed by : Initials
-
Remove rubber mat, hand-clean and sanitize door prior to install. ATP swab door
-
ATP swab results.
-
Task completed by : Initials
-
Cover rubber CIP mat with plastic
-
Task completed by : Initials
-
Inlet duct door has been hand-cleaned, sanitized and inserted. ATP swab door
-
ATP swab results.
-
Task completed by : Initials
-
All man doors are secure and tight
-
Task completed by : Initials
Dryer 3rd Level (52ft Deck) - TO BE DONE PRIOR TO BLOW DRYING
-
CIP bustle connections (8) need to be removed and capped off under the deck
-
Task completed by:
-
East and west cyclones have been inspected and found to be clean
-
Task completed by : Initials
-
CIP wands (4) from dryer to east cyclone duct have been removed
-
Task completed by : Initials
-
CIP wands (4) from dryer to west cyclone duct have been removed
-
Task completed by : Initials
-
Gaskets (2) from dryer to east cyclone are clean and in good condition-Sanitize
-
Task completed by : Initials
-
Gaskets (2) from dryer to west cyclone are clean and in good condition-Sanitize
-
Task completed by : Initials
-
CIP wands (5) have been removed and capped off for east cyclone
-
Task completed by : Initials
-
CIP wands (5) have been removed and capped off for west cyclone
-
Task completed by : Initials
-
Boots for east and west baghouse are in good condition
-
Task completed by : Initials
-
Boot for exhaust is in good condition
-
Task completed by : Initials
Dryer 2nd Level (25ft Deck) - TO BE DONE PRIOR TO BLOW DRYING
-
East and west cyclone star valves are clean
-
Task completed by : Initials
-
East and west cyclone are clean
-
Task completed by : Initials
-
Boot for dryer inlet is in good condition
-
Task completed by : Initials
-
Air inlet filters are dry
-
Task completed by : Initials
-
Dehumidifier filter is dry
-
Task completed by : Initials
-
CIP wands for east and west cyclones are removed and ports capped
-
Task completed by : Initials
Dryer Ground Floor - TO BE DONE PRIOR TO BLOW DRYING
-
Door gasket for man way is in good condition-sanitize gasket and gasket surface with alcohol sanitizer. ATP swab door insert
-
ATP swab results:
-
Task completed by : Initials
-
Dry and sanitize man way opening at bottom of main chamber
-
ATP swab results:
-
Task completed by : Initials
-
Main star valve is clean
-
Task completed by : Initials
-
Conveyor BFM fitting is clean and in good condition
-
Task completed by : Initials
Blow drying
-
Blow dry chamber and cyclones for 4 hours using inlet fan only- Start time
After Blow Drying Assembly
-
Has blow drying been completed?
Dryer 3rd Level (52ft Deck) - TO BE DONE AFTER BLOW DRYING
-
Man way inserts (4) are clean and inserted into manway doors for east cyclone and duct-sanitize with alcohol sanitizer. ATP swab inserts (4); collect zone 1 swab at cyclone duct
-
ATP swab results:
-
Task completed by:
-
Man way inserts (4) are clean and inserted into manway doors for west cyclone and duct--sanitize with alcohol sanitizer. ATP swab inserts (4); collect zone 1 swab at cyclone duct
-
ATP swab results:
-
Task completed by:
-
Manway gaskets (8 total) for east and west man way doors are clean and in good condition-sanitize with alcohol sanitizer
-
Task completed by:
-
The BFM boots (east and west) that connect the cyclones to the baghouse must be clean, sanitized, and<br>ATP swabbed. After a passing result the caps that separate the cyclones from the<br>baghouse can be removed and the boots can be installed.
-
ATP swab results:
-
Task completed by:
-
All man doors are secure and tight.
-
Task completed by:
Dryer 2nd Level (25ft Deck) - TO BE DONE AFTER BLOW DRYING
-
East and west conveying line T's are ATP swabbed and zone 1 swabs are taken. Line is set back up for process
-
ATP swab results:
-
Task completed by:
-
East and west cyclone star valves must be clean, sanitized, and ATP swabbed
-
ATP swab results:
-
East and west man way doors are clean-sanitize with alcohol sanitizer
-
Task completed by:
-
Gaskets for East and west man way doors (2) are clean and in good condition-sanitize with alcohol sanitizer. ATP man way inserts (2)
-
ATP swab results:
-
Task completed by:
-
Magnahelic wands (2) are clean and free of cracks-sanitize with alcohol sanitizer. ATP swab magnahelic wands (2)
-
ATP swab results:
-
Task completed by:
-
Boot for dead end exhaust is in good condition
-
Task completed by:
-
All man doors are secure and tight
-
Task completed by:
Dryer Ground Floor - TO BE DONE AFTER BLOW DRYING
-
Tailing can, piping, and bfm boots are clean and assembled. ATP swab (2) bfm boots for tailing can.
-
ATP swab results:
-
Task completed by:
-
Main conveying line is clean and put back together. ATP swab conveying line; zone 1 swab collected; an additional zone 1 swab is collect at interior of chamber at opening
-
ATP swab results:
-
Task completed by:
-
Magnahelic wand for main chamber is clean-sanitize with alcohol sanitizer. ATP swab magnahelic wand
-
ATP swab results:
-
Task completed by:
-
Drain for east and west cyclone is capped off
-
Task completed by:
-
Supply and return for CIP is switched back to evap from CIP
-
Task completed by:
-
Return pump for dryer is capped off
-
Task completed by:
-
All man doors are secure and tight
-
Task completed by:
After blow dry assembly cleaning prior to heat.
-
Has assembly of all levels been completed.
All diamond decking and stairwell
-
All diamond decking and stair well mopped. (photo required)
-
Task completed by:
Dryer ground floor: Clean and wipe the following areas with sani wipes.
-
Tailing can and all components
-
Task completed by:
-
Framework of the hopper
-
Task completed by:
-
Powder hopper star valve
-
Task completed by:
-
Powder conveying line
-
Task completed by:
-
Waste bag stand
-
Task completed by:
-
Foss and sampler control box
-
Task completed by:
-
Sampler and surrounding piping
-
Task completed by:
-
Powder conveying line
-
Task completed by:
-
Main star valve is clean
-
Task completed by:
-
Dead end star valve
-
Task completed by:
-
Sifter knobs
-
Task completed by:
-
Tailing can containment mopped (photo required)
-
Task completed by:
-
Sifter deck mopped (photo required)
-
Task completed by:
-
Clean mats and apply alkaline peroxide powder.
-
Task completed by:
25ft. Deck: Clean and wipe the following areas with sani wipes.
-
Clean top of deadend baghouse (Sponge swab location)
-
Task completed by:
-
Man door on air inlet and air inlet filter box.
-
Task completed by:
-
Exterior of dehumidifier
-
Task completed by:
-
West cyclone exterior
-
Task completed by:
-
West "T" star valve
-
Task completed by:
-
Aftercoolers and blowers
-
Task completed by:
-
West baghouse man door and star valve
-
Task completed by:
-
East cyclone exterior
-
Task completed by:
-
East "T" star valve
-
Task completed by:
-
Aftercoolers and blowers
-
Task completed by:
-
East baghouse man door and star valve
-
Task completed by:
-
Decking mopped (photo required)
-
Task completed by:
-
Clean mat and apply alkaline peroxide powder.
-
Task completed by:
52ft. Deck: Clean and wipe the following areas with sani wipes
-
West cyclone CIP caps (4)
-
Task completed by:
-
West baghouse man door
-
Task completed by:
-
Upper west cyclone man door and top of west cyclone.
-
Task completed by:
-
Lower man door of west cyclone
-
Task completed by:
-
Lower baghouse duct door of west cyclone
-
Task completed by:
-
East cyclone CIP caps (4)
-
Task completed by:
-
East baghouse man door.
-
Task completed by:
-
Upper east cyclone man door and top of east cyclone.
-
Task completed by:
-
Lower baghouse duct door of east cyclone.
-
Task completed by:
-
Decking mopped. (photo required)
-
Task completed by:
-
Clean mat and apply alkaline peroxide powder.
-
Task completed by:
8th floor: Inspection port deck
-
Dryer sight glass, handles, and door wipe with sani wipes.
-
Task completed by:
-
Deck mopped (Photo Required)
-
Task completed by:
Dome: Clean and wipe the following areas with sani wipes.
-
All wand hoses and ports
-
Task completed by:
-
CIP piping around wands inserts
-
Task completed by:
-
Floor inserts
-
Task completed by:
-
Exterior and surrounding area of man doors (2)
-
Task completed by:
-
Actuators, conduits and j-boxes
-
Task completed by:
-
Deck mopped (Photo Required)
-
Task completed by:
-
Clean mat and apply alkaline peroxide powder.
-
Task completed by:
To be done just before production
-
Insure correct feedline wands are installed (check with control room)
-
Which feedline is connected
-
Task completed by:
QA level clearance
-
Have all checklist items been completed
Ground floor
-
Cleared for production
-
Cleared by:
-
Select date
25 ft. Deck
-
Cleared for production
-
Cleared by:
-
Select date
52 ft. Deck
-
Cleared for production
-
Cleared by:
-
Select date
Dome
-
Cleared for production
-
Cleared by:
-
Select date
Dryer Preheating Temperature Log
-
Preheating Start time:
Once dryer re assembly is complete and QA has cleared all levels, run dryer preheat step.( exhaust temperature >190F) for 2 hours- start time
-
Select date
During dryer preheating step take contact temperatures from preheating temperature log and document results at hour 1 and hour 2.
-
Select date
During dryer preheating step, heat powder conveying system using duhumidifier reheat control (>190F on heater)
-
Task completed by:
After 1 hour of running, after start up check for any powder leaks on the main, 25ft, and 52 ft levels
-
Task completed by:
-
Time 190F was achieved (TE7504)
-
Dryer inlet temperature (TE7523)
Preheating temperatures Hourly readings (2 hrs required) Hour #
-
Time of readings:
-
Task completed by : Initials
-
Dryer inlet temperature (TE7523)
-
Dryer Exhaust Temperature(TE7504)
-
Dead End Baghouse Exhaust Temperature(TE7542)
-
Powder Conveying System Temperature(TE7535)
-
East Baghouse Temperature(TE7656)
-
East Baghouse Temperature(TE7657)
-
East Baghouse Temperature(TE7658)
-
East Baghouse Temperature(TE7659)
-
West Baghouse Temperature(TE7664)
-
West Baghouse Temperature(TE7665)
-
West Baghouse Temperature(TE7666)
-
West Baghouse Temperature(TE7667)
-
Main Chamber Contact Temperature(bottom of the cone above star valve)
-
West Cyclone Contact Temperature(bottom of the cone above star valve)
-
West Baghouse Contact Temperature(bottom of baghouse above star valve)
-
East Cyclone Contact Temperature(bottom of the cone above star valve)
-
East Baghouse Contact Temperature(bottom of baghouse above star valve)