Title Page
-
Site Name
Site Details
-
Address
-
Task Number
-
SVO number
-
Contractor Name
-
Technician name
-
Date
General Questions
-
Equipment Condition - will it last 12 months
-
Are there options to replacing like for like (e.g Multiple Split system for single ducted system)
-
Type
-
Why not
-
Is there a site asbestos register to indicate there is asbestos on site
-
Will this affect the proposed works and why
-
Is there safe access to the roof
-
Can temporary safe access be applied
-
Why not
-
Is there clear access to the plant
-
Why not
Coolrooms
-
System Cooling Capacity
-
Condenser Models
-
Room Dimensions - L x W x H
-
Number of insert doors
-
Refrigerant pipe run length in Meters
-
Electrical Cable run in Meters
-
Refrigerant Pipe run access
-
Condenser Location
-
Is a crane required
-
Labour to complete the job
-
Is temporary refrigeration required?
-
Qty
-
Refrigerant type and Qty?
-
Refrigerant pipe run length in Meters
Main Trading area
-
Condenser Models
-
Evaporator Models
-
System Cooling Capacity
-
Equipment Type - Split Ducted, Packaged, High wall split, cassette split,
-
Room Dimensions - L x W x H
-
Are mounting brackets required?
-
Qty
-
Is a cage required?
-
Qty
-
Heat load (use Caltex heat load calculator)
-
Refrigerant pipe run length in Meters
-
Refrigerant Pipe run access
-
What is the Issue
-
Electrical power available
-
Single or three phase
-
Electrical Cable run in Meters
-
Is a crane required
-
Condenser Location
-
Access to drains
-
Temporary AC required?
-
Qty
-
Condensate pumps required?
-
Qty
-
Ducting suitable
-
Why and Quantity
-
Transition section required
-
Qty and dimensions
-
Labour to complete the job