Title Page
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
1.0 Site Establishment
-
INSTRUCTIONS
1. Answer all the questions below. This is mandatory.
2. Add photos and notes by clicking on the paperclip icon.
3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority, and due date.
4. Complete audit by providing digital signature.
5. Share your report by exporting as PDF, Word, Excel or Web Link.
1.0 Site Establishment
-
1. Site fencing installed
-
2. H&S signage posted
-
3. First Aid equipment and fire extinguisher available
-
4. Site sheds and allocated area
-
5. Sanitary facilities
-
6. Washing and drinking water
-
7. Temporary power
-
8. Temporary water supply
-
9. Datum levels found or received and date received
-
10. Geotechnical Engineer inspection and date inspected
-
11. Boundary pegs sited and marked
-
12. Setting out of structure
-
13. Pavement crossing protection
-
14. Wheel wash or water at gate
-
15. Security lighting alarms etc.
-
16. Fence off any hazards protected trees and no go areas
-
17. Silt fences and erosion controls
-
18. Inform the nieghbours, leave business card
-
19. Keys allocated and record of who has what
-
20. Platform is at correct height
-
21. Pre-start meetings completed (incl council)
-
22. PS4 geo for platforms
-
23. Titling
-
24. RC Conditions read and included in programme
2.0 Underslab Service
UNDERSLAB Service
-
1. Geotech report checked and PS4 issued
-
2. Surveyor pegs and datums provided
-
3. Any retaining is completed prior to digging
-
4. Identify and mark existing pipe and services
-
5. Stacks and ground floor pipes, correct numbers diameters and locations
-
6. Pipes are wrapped properly
-
7. Check for gas, water, power, phone, fibre, conduits within and entering slab edge
-
8. Check final kitchen plan
-
9. Council inspection passed
-
10. PS3 and asbuilt provided
-
11. Solid caps to all upstand pipes
3.0 Foundations
Foundations
-
1. Setting out checked, get surveyors certificate
-
2. Check orders/plans for non-standard items
-
3. Excavation levels, confirm datum
-
4. Steel re-enforcement to floor slab as per engineer specifications
-
5. Check rebates for joniery, location and depth
-
6. Check perimeter correct for cladding type
-
7. Engineers inspection and date inspected
-
8. Council inspection and date inspected
-
9. Close out Works over if any
4.0 Block Work
Block Work
-
1. Setting out
-
2. Block specification
-
3. Steel re-enforcing
-
4. Scaffolding
-
5. Grout joints. Wash outs
-
6. Wash outs cleanliness
-
7. Engineer inspection and date for footing/steel/blocks
-
8. Wash outs boxing
-
9. Block work heights. Grouting and strength
-
10. Block work. Work bonds
-
11. Blockwork cleanliness
-
12. Nova flow and waterproofing certifed
-
13. Clean any splash or overflow from grout pour dont overfill
-
14. Ensure grout pour fills all blocks
-
15. ensure grout is pointed if finished work and grout lines are even
5.0 Framing
FRAMING
-
1. Right lay out
-
2. DPC in place, ground floor and wet area upstairs
-
3. Plumb and Square--kitchen, bathroom, stairwell
-
4. All fixing, bracing elements and hold-downs
-
5. Structural steel lay out and fixing
-
6. Intertenancy wall installed as per requirement (layout, bracket, fixing and control joint)
-
7. Joist lay out, pre-punched service holes and wet area
-
8. Right doors and windows opening
-
9. Correct roof trussed layout and fixing
-
10. Roof bracing as detailed
-
11. Nogs for roof flashing in place
-
12. Nogs for stairs, shower, bath and all corners, ready for GIB
-
13. All nogs and services for future installation, includign garage door, ceiling hatch etc
-
14. Ceiling hatch nogged out correctly
-
15. All fire stopping block in place and as per requirement
-
16. Bath cradle framed correctly
-
17. Penetrations sealed, proprietary patches only
-
18. Check NTC's VO's
-
19. Design review for site lines pre-wrap
-
20. Distribution to PM
-
21. Check progress against programme and comment
-
22. Engineers inspection passed
-
23. Council inspection passed
-
24. HIRB survey ordered and completed
6.0 Roof
Roof
-
1. Preparation- Roof trusses, Purlins, Bracing, Fiscia and Gutter
-
2. Underlay installed as per requirement(Self-support, Mesh, Strapping) including correct product for fire
-
3. Roofing profile, metal and colour as per specification
-
4. Check flashings, particularly saddles correctly formed and lapped
-
5. Clear trade debris and unused materials from the roof
-
6. Sweep down the completed roof and flush out the spouting, gutter.
-
7. Do not drop scaffold until all these have been satisfied
7.0 Electrical
ELECTRICAL
-
1. All wiring as per drawing and setout
-
2. Check orders/plans for non-standard items
-
3. Check final kitchen plan
-
4. Steel boxes used in fire walls
-
5. Pipes are sealed
-
6. All penetrations supported and sealed properly
-
7. Exterior light fixtures installed plumb, level and operational and sealed
-
8. Weatherproof outlet covers installed in good condition and sealed
-
9. HVAC unit installed
-
10. Check NTC's VO's
-
11. Photgraph walls with clarity of which space they are from
8.0 Plumbing
PLUMBING
-
1. Verify plumbing fittings as per specs
-
2. Check hotwater cylinder cleances and maximum use of cupboard space
-
3. Holes drilled in studs and nogs clear all fixings to be used
-
4. Check fire requirements for penetrations
-
5. Water pressure verified
-
6. Preline plumbing inspection done and date.
-
7. No trash in supply lines
-
8. Check NTC's VO's
-
9. Final inspecion plumbing done and date.
9.0 Brick
Brick
-
1. All flashings in place, junction detailed to other claddings and in correct sequenceing
-
2. Shelf angles correctly flashed and installed
-
3. Correct durability requirements for steel components
-
4. Checking fire rating requirement
-
5. Half high passed
-
6. Inspection passed and date
-
7. Mortar splashes all cleaned off and bricks re-check before scaff drop
10.0 Weatherboard
Weatherboard
-
1. All flashings in place, junction detailed to other claddings and in correct sequenceing
-
2. Correct durability requirements for steel components
-
3. Checking fire rating requirement
-
4. Cavity batten and closer installed properly if required
-
5. Wrapping and cavity inspection passed and date
-
6. All cut edges primed
-
7. Soaker, corner molding, trims. scribers in place
-
8. Inspection passed and date
-
9. Re-check flashings and junctions as well as paint application before scaff drop
11.0 GIB
GIB
-
1. Preline inspection done and date
-
2. Electrical and plumbing QA sheets lodged with PM
-
3. All corners at walls & ceilings are plumb and square, especially in stairwell through midfloor area
-
4. Check fire requirements
-
5. Check acoustic requirements
-
6. Multiple inspections passed as required to achieve above
-
7. Right finish level
-
8. External corner slimline are straight, plumb and level
-
9. Switches and Outlet Cleaned of Compound
-
10. Check stopping prior to painters starting
12.0 Carpentry-Trim and Railing
CARPENTRY-TRIM & RAILING
-
1. Trim joints tight, all mitres closed and flush
-
2. Rachitraves flush with skirts where they meet
-
3. Nails counter sunk
-
4. Check for Gouges, Nicks and Splits
-
5. Verify all trim and doors are plumb and square
-
6. Doors hung and enough gap for carpets and painting
-
7. Check for Gouges, Nicks and Splits
-
8. Verify all trim and doors are plumb and square
-
9. Doors hung and enough gap for carpets and painting
-
10. Door reveals even
-
11. Quirks are the same and even
-
12. Painters to inspect before starting
13.0 Painting
PAINTING
-
1. GIB fix and stop QA paperwork logged
-
2. Unpainted surfaces protected (Including flooring)
-
3. Nail holes in trim filled and smooth
-
4. Check colour and specification
-
5. Paint doors six sides
-
6. All tape removed cleanly at completion
-
7. All surfaces correct coverage and level of finish
14.0 Flooring
FLOORING
-
1. Floors are clean to lay carpet
-
2. Carpet being laid is according to the specification
-
3. Carpet stretched properly, no bubbles, humps, etc.
-
4. Walls / baseboard checked and left free of damage.
-
5. No color variation
-
6. All seams checked to be clean, tight, not raised and thoughtful positioned
-
7. Vinyl being laid is according to the specification
-
8. Check for bubbles in the vinyl and scratches
-
9. Are the corners and vinyl welding true and straight.
-
10. Has all door and cupboard guides and thresh hold bars installed
-
11. Flooring protected
15.0 Tile
Tile
-
1. Showers to falls
-
2. Waterproofing correctly compled, including in FWG and PS3 install and product warranties received
-
3. Silicone around fixtures
-
4. Flooring protected
-
5. Skirting tiles grout lines to line up with floor tiles
-
6. Shower trap set correctly
-
7. Cuts thoughtfully placed
16.0 Drainage
Drainage
-
1. Existing pipes located
-
2. Connections uncovered to confirm inverts
-
3. Manhole depths verified for falls
-
4. Identify and mark existing pipe and services
-
5. Drainage inspection done and date
-
6. Drawing check to make sure it is recent
-
7. Check clash with other services
-
8. Engineers inspection of detention tank passsed
-
9. Check for gas, water, power, phone, fibre
-
10. Check final kitchen plan
-
11. Council inspection passed
-
12. PS3 and asbuilt provided
17 Fitoff
Fitoff
-
1. Outlet & Switch Covers Plumb & Level
-
2. Light Fixtures Installed Flush to Ceilings
-
3. Check All Exhaust Fans are Operating Properly
-
4. Test All Smoke Detectors
-
5. Switch board labelled
-
6. HVAC unit installed and comissioned
-
7. House livened
-
8. Verify plumbing fittings as per specs
-
9. Water pressure verified
18.0 Final inspection
Final inspection
-
1. Front door installed and operating
-
2. Electrical fit off as per plan
-
3. Skirting and architraves complete and in good condition
-
4. Windows and doors operating and correct hardware installed
-
5. Internal doors complete and operating
-
6. Tiles complete, clean and in good condition
-
7. Carpet complete, clean and in good condition
-
8. Timber floor complete, clean and in good condition
-
9. Wall paint snagging complete
-
10. Ceiling paint snagging complete
-
11. Manhole cover in place
-
12. Robe doors complete and operating and painted
-
13. Robe shelving complete and operating
-
14. Kitchen benchtop installed, clean and in good condition
-
15. All appliances operational, incl tapware
-
16. Soft close drawers work
-
17. Cabinet doors and drawers aligned and work freely
-
18. Door gaps acceptable
-
19. Splashback installed, clean and in good condition
-
20. Shower screen installed and tested
-
21. Floor waste installed and tested
-
22. Mirror installed and clean and straight
-
23. Vanity unit installed, draws work freely
-
24. Taps in working condition and clean
-
25. Towel rails, roll holders etc installed, operating and clean
-
26. Bath sealed, overflow present if required
-
27. Toilet pan/seat sealed
-
28. Laundry tub sealed
-
29. Mechanical vents working
-
30. HWC unit turned on and hot water running
-
31. HWC restraints fitted
-
32. Roof and gutter clean from debris
-
33. External wash complete
-
34. Weep Holes clear
-
35. External concrete clean, with saw cuts
-
36. Exterior lights working
-
37. Decks/stairs and handrails installed and operating correctly
-
38. Landscaping complete
-
39. WC/Temp power removed
-
40. All rubbish removed
-
41. Confirm no damage to footpath
-
42. Garage door working
Sign off
-
Name and Signature of Inspector