Title Page

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

1.0 Site Establishment

  • INSTRUCTIONS

    1. Answer all the questions below. This is mandatory.
    2. Add photos and notes by clicking on the paperclip icon.
    3. To add a Corrective Measure click on the paperclip icon then "Add Action", provide a description, assign to a member, set priority, and due date.
    4. Complete audit by providing digital signature.
    5. Share your report by exporting as PDF, Word, Excel or Web Link.

1.0 Site Establishment

  • 1. Site fencing installed

  • 2. H&S signage posted

  • 3. First Aid equipment and fire extinguisher available

  • 4. Site sheds and allocated area

  • 5. Sanitary facilities

  • 6. Washing and drinking water

  • 7. Temporary power

  • 8. Temporary water supply

  • 9. Datum levels found or received and date received

  • 10. Geotechnical Engineer inspection and date inspected

  • 11. Boundary pegs sited and marked

  • 12. Setting out of structure

  • 13. Pavement crossing protection

  • 14. Wheel wash or water at gate

  • 15. Security lighting alarms etc.

  • 16. Fence off any hazards protected trees and no go areas

  • 17. Silt fences and erosion controls

  • 18. Inform the nieghbours, leave business card

  • 19. Keys allocated and record of who has what

  • 20. Platform is at correct height

  • 21. Pre-start meetings completed (incl council)

  • 22. PS4 geo for platforms

  • 23. Titling

  • 24. RC Conditions read and included in programme

2.0 Underslab Service

UNDERSLAB Service

  • 1. Geotech report checked and PS4 issued

  • 2. Surveyor pegs and datums provided

  • 3. Any retaining is completed prior to digging

  • 4. Identify and mark existing pipe and services

  • 5. Stacks and ground floor pipes, correct numbers diameters and locations

  • 6. Pipes are wrapped properly

  • 7. Check for gas, water, power, phone, fibre, conduits within and entering slab edge

  • 8. Check final kitchen plan

  • 9. Council inspection passed

  • 10. PS3 and asbuilt provided

  • 11. Solid caps to all upstand pipes

3.0 Foundations

Foundations

  • 1. Setting out checked, get surveyors certificate

  • 2. Check orders/plans for non-standard items

  • 3. Excavation levels, confirm datum

  • 4. Steel re-enforcement to floor slab as per engineer specifications

  • 5. Check rebates for joniery, location and depth

  • 6. Check perimeter correct for cladding type

  • 7. Engineers inspection and date inspected

  • 8. Council inspection and date inspected

  • 9. Close out Works over if any

4.0 Block Work

Block Work

  • 1. Setting out

  • 2. Block specification

  • 3. Steel re-enforcing

  • 4. Scaffolding

  • 5. Grout joints. Wash outs

  • 6. Wash outs cleanliness

  • 7. Engineer inspection and date for footing/steel/blocks

  • 8. Wash outs boxing

  • 9. Block work heights. Grouting and strength

  • 10. Block work. Work bonds

  • 11. Blockwork cleanliness

  • 12. Nova flow and waterproofing certifed

  • 13. Clean any splash or overflow from grout pour dont overfill

  • 14. Ensure grout pour fills all blocks

  • 15. ensure grout is pointed if finished work and grout lines are even

5.0 Framing

FRAMING

  • 1. Right lay out

  • 2. DPC in place, ground floor and wet area upstairs

  • 3. Plumb and Square--kitchen, bathroom, stairwell

  • 4. All fixing, bracing elements and hold-downs

  • 5. Structural steel lay out and fixing

  • 6. Intertenancy wall installed as per requirement (layout, bracket, fixing and control joint)

  • 7. Joist lay out, pre-punched service holes and wet area

  • 8. Right doors and windows opening

  • 9. Correct roof trussed layout and fixing

  • 10. Roof bracing as detailed

  • 11. Nogs for roof flashing in place

  • 12. Nogs for stairs, shower, bath and all corners, ready for GIB

  • 13. All nogs and services for future installation, includign garage door, ceiling hatch etc

  • 14. Ceiling hatch nogged out correctly

  • 15. All fire stopping block in place and as per requirement

  • 16. Bath cradle framed correctly

  • 17. Penetrations sealed, proprietary patches only

  • 18. Check NTC's VO's

  • 19. Design review for site lines pre-wrap

  • 20. Distribution to PM

  • 21. Check progress against programme and comment

  • 22. Engineers inspection passed

  • 23. Council inspection passed

  • 24. HIRB survey ordered and completed

6.0 Roof

Roof

  • 1. Preparation- Roof trusses, Purlins, Bracing, Fiscia and Gutter

  • 2. Underlay installed as per requirement(Self-support, Mesh, Strapping) including correct product for fire

  • 3. Roofing profile, metal and colour as per specification

  • 4. Check flashings, particularly saddles correctly formed and lapped

  • 5. Clear trade debris and unused materials from the roof

  • 6. Sweep down the completed roof and flush out the spouting, gutter.

  • 7. Do not drop scaffold until all these have been satisfied

7.0 Electrical

ELECTRICAL

  • 1. All wiring as per drawing and setout

  • 2. Check orders/plans for non-standard items

  • 3. Check final kitchen plan

  • 4. Steel boxes used in fire walls

  • 5. Pipes are sealed

  • 6. All penetrations supported and sealed properly

  • 7. Exterior light fixtures installed plumb, level and operational and sealed

  • 8. Weatherproof outlet covers installed in good condition and sealed

  • 9. HVAC unit installed

  • 10. Check NTC's VO's

  • 11. Photgraph walls with clarity of which space they are from

8.0 Plumbing

PLUMBING

  • 1. Verify plumbing fittings as per specs

  • 2. Check hotwater cylinder cleances and maximum use of cupboard space

  • 3. Holes drilled in studs and nogs clear all fixings to be used

  • 4. Check fire requirements for penetrations

  • 5. Water pressure verified

  • 6. Preline plumbing inspection done and date.

  • 7. No trash in supply lines

  • 8. Check NTC's VO's

  • 9. Final inspecion plumbing done and date.

9.0 Brick

Brick

  • 1. All flashings in place, junction detailed to other claddings and in correct sequenceing

  • 2. Shelf angles correctly flashed and installed

  • 3. Correct durability requirements for steel components

  • 4. Checking fire rating requirement

  • 5. Half high passed

  • 6. Inspection passed and date

  • 7. Mortar splashes all cleaned off and bricks re-check before scaff drop

10.0 Weatherboard

Weatherboard

  • 1. All flashings in place, junction detailed to other claddings and in correct sequenceing

  • 2. Correct durability requirements for steel components

  • 3. Checking fire rating requirement

  • 4. Cavity batten and closer installed properly if required

  • 5. Wrapping and cavity inspection passed and date

  • 6. All cut edges primed

  • 7. Soaker, corner molding, trims. scribers in place

  • 8. Inspection passed and date

  • 9. Re-check flashings and junctions as well as paint application before scaff drop

11.0 GIB

GIB

  • 1. Preline inspection done and date

  • 2. Electrical and plumbing QA sheets lodged with PM

  • 3. All corners at walls & ceilings are plumb and square, especially in stairwell through midfloor area

  • 4. Check fire requirements

  • 5. Check acoustic requirements

  • 6. Multiple inspections passed as required to achieve above

  • 7. Right finish level

  • 8. External corner slimline are straight, plumb and level

  • 9. Switches and Outlet Cleaned of Compound

  • 10. Check stopping prior to painters starting

12.0 Carpentry-Trim and Railing

CARPENTRY-TRIM & RAILING

  • 1. Trim joints tight, all mitres closed and flush

  • 2. Rachitraves flush with skirts where they meet

  • 3. Nails counter sunk

  • 4. Check for Gouges, Nicks and Splits

  • 5. Verify all trim and doors are plumb and square

  • 6. Doors hung and enough gap for carpets and painting

  • 7. Check for Gouges, Nicks and Splits

  • 8. Verify all trim and doors are plumb and square

  • 9. Doors hung and enough gap for carpets and painting

  • 10. Door reveals even

  • 11. Quirks are the same and even

  • 12. Painters to inspect before starting

13.0 Painting

PAINTING

  • 1. GIB fix and stop QA paperwork logged

  • 2. Unpainted surfaces protected (Including flooring)

  • 3. Nail holes in trim filled and smooth

  • 4. Check colour and specification

  • 5. Paint doors six sides

  • 6. All tape removed cleanly at completion

  • 7. All surfaces correct coverage and level of finish

14.0 Flooring

FLOORING

  • 1. Floors are clean to lay carpet

  • 2. Carpet being laid is according to the specification

  • 3. Carpet stretched properly, no bubbles, humps, etc.

  • 4. Walls / baseboard checked and left free of damage.

  • 5. No color variation

  • 6. All seams checked to be clean, tight, not raised and thoughtful positioned

  • 7. Vinyl being laid is according to the specification

  • 8. Check for bubbles in the vinyl and scratches

  • 9. Are the corners and vinyl welding true and straight.

  • 10. Has all door and cupboard guides and thresh hold bars installed

  • 11. Flooring protected

15.0 Tile

Tile

  • 1. Showers to falls

  • 2. Waterproofing correctly compled, including in FWG and PS3 install and product warranties received

  • 3. Silicone around fixtures

  • 4. Flooring protected

  • 5. Skirting tiles grout lines to line up with floor tiles

  • 6. Shower trap set correctly

  • 7. Cuts thoughtfully placed

16.0 Drainage

Drainage

  • 1. Existing pipes located

  • 2. Connections uncovered to confirm inverts

  • 3. Manhole depths verified for falls

  • 4. Identify and mark existing pipe and services

  • 5. Drainage inspection done and date

  • 6. Drawing check to make sure it is recent

  • 7. Check clash with other services

  • 8. Engineers inspection of detention tank passsed

  • 9. Check for gas, water, power, phone, fibre

  • 10. Check final kitchen plan

  • 11. Council inspection passed

  • 12. PS3 and asbuilt provided

17 Fitoff

Fitoff

  • 1. Outlet & Switch Covers Plumb & Level

  • 2. Light Fixtures Installed Flush to Ceilings

  • 3. Check All Exhaust Fans are Operating Properly

  • 4. Test All Smoke Detectors

  • 5. Switch board labelled

  • 6. HVAC unit installed and comissioned

  • 7. House livened

  • 8. Verify plumbing fittings as per specs

  • 9. Water pressure verified

18.0 Final inspection

Final inspection

  • 1. Front door installed and operating

  • 2. Electrical fit off as per plan

  • 3. Skirting and architraves complete and in good condition

  • 4. Windows and doors operating and correct hardware installed

  • 5. Internal doors complete and operating

  • 6. Tiles complete, clean and in good condition

  • 7. Carpet complete, clean and in good condition

  • 8. Timber floor complete, clean and in good condition

  • 9. Wall paint snagging complete

  • 10. Ceiling paint snagging complete

  • 11. Manhole cover in place

  • 12. Robe doors complete and operating and painted

  • 13. Robe shelving complete and operating

  • 14. Kitchen benchtop installed, clean and in good condition

  • 15. All appliances operational, incl tapware

  • 16. Soft close drawers work

  • 17. Cabinet doors and drawers aligned and work freely

  • 18. Door gaps acceptable

  • 19. Splashback installed, clean and in good condition

  • 20. Shower screen installed and tested

  • 21. Floor waste installed and tested

  • 22. Mirror installed and clean and straight

  • 23. Vanity unit installed, draws work freely

  • 24. Taps in working condition and clean

  • 25. Towel rails, roll holders etc installed, operating and clean

  • 26. Bath sealed, overflow present if required

  • 27. Toilet pan/seat sealed

  • 28. Laundry tub sealed

  • 29. Mechanical vents working

  • 30. HWC unit turned on and hot water running

  • 31. HWC restraints fitted

  • 32. Roof and gutter clean from debris

  • 33. External wash complete

  • 34. Weep Holes clear

  • 35. External concrete clean, with saw cuts

  • 36. Exterior lights working

  • 37. Decks/stairs and handrails installed and operating correctly

  • 38. Landscaping complete

  • 39. WC/Temp power removed

  • 40. All rubbish removed

  • 41. Confirm no damage to footpath

  • 42. Garage door working

Sign off

  • Name and Signature of Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.