Information

  • Audit No.

  • RAMC North Coast Region - Traffic Signage Audit

  • Audit Title

  • Contractor

  • Road

  • Start & End Chainage

  • Conducted on

  • Prepared by

Traffic General

  • MUTCD Diagram Number

  • Contractor's TGS onsite?<br>(include photo if available)

  • Traffic Signage Records being completed onsite?<br>(include photo of records sheet if available)

  • Level 2 Traffic Controller onsite?<br>(include photo of accreditation if available)

  • All signage and traffic management in accordance with MUTCD and other relevent specifications (including removal/non-removal of signs when works are completed).

  • Speed zones and/or flagmen signs only active when work is being performed or are required for user safety.

  • Limits of speed zones and/or flagmen signs applicable to the limit of the physical work on the Site

  • Minimal impact on traffic flow

  • Other site details (Works being completed, Traffic Controller, Personnel onsite, etc)

Signage

  • Traffic Direction 1

  • Select Signs used onsite
    (Included photo and chainage)

  • Roadworks Ahead 1km

  • Roadworks Ahead / 80km / Reduce Speed

  • Roadworks Ahead / 60km / Reduce Speed

  • Roadworks Ahead

  • Workmen Ahead / 60km / Reduce Speed

  • Workmen Ahead / 60km Ahead / Reduce Speed

  • Workmen Ahead / 40km Ahead / Reduce Speed

  • Workmen Ahead

  • Traffic Controller / Prepare to Stop / Do Not Overtake

  • Traffic Controller / 60km / Prepare to Stop

  • Traffic Controller / 40km Ahead / Prepare to Stop

  • Speed Sign 40km, 60km, 80km<br>(indicate which sign)

  • End Roadworks / Speed / Drive Safety

  • Lane Closure<br>(indicate number of lanes)

  • Mowing Ahead

  • Other Signs / Devices utilised<br>(include details of signs)

  • Traffic Direction 2

  • Select Signs used onsite
    (Included photo and chainage)

  • Roadworks Ahead 1km

  • Roadworks Ahead / 80km / Reduce Speed

  • Roadworks Ahead / 60km / Reduce Speed

  • Roadworks Ahead

  • Workmen Ahead / 60km / Reduce Speed

  • Workmen Ahead / 60km Ahead / Reduce Speed

  • Workmen Ahead / 40km Ahead / Reduce Speed

  • Workmen Ahead

  • Traffic Controller / Prepare to Stop / Do Not Overtake

  • Traffic Controller / 60km / Prepare to Stop

  • Traffic Controller / 40km Ahead / Prepare to Stop

  • Speed Sign 40km, 60km, 80km<br>(indicate which sign)

  • End Roadworks / Speed / Drive Safety

  • Lane Closure<br>(indicate number of lanes)

  • Mowing Ahead

  • Other Signs / Devices utilised<br>(include details of signs)

  • Traffic Direction 3

  • Select Signs used onsite
    (Included photo and chainage)

  • Roadworks Ahead 1km

  • Roadworks Ahead / 60km / Reduce Speed

  • Roadworks Ahead

  • Workmen Ahead / 60km / Reduce Speed

  • Workmen Ahead / 60km Ahead / Reduce Speed

  • Workmen Ahead / 40km Ahead / Reduce Speed

  • Workmen Ahead

  • Traffic Controller / Prepare to Stop / Do Not Overtake

  • Traffic Controller / 60km / Prepare to Stop

  • Traffic Controller / 40km Ahead / Prepare to Stop

  • Speed Sign 40km, 60km, 80km<br>(indicate which sign)

  • End Roadworks / Speed / Drive Safety

  • Lane Closure<br>(indicate number of lanes)

  • Mowing Ahead

  • Other Signs / Devices utilised<br>(include details of signs)

  • Traffic Direction 4

  • Select Signs used onsite
    (Included photo and chainage)

  • Roadworks Ahead 1km

  • Roadworks Ahead / 80km / Reduce Speed

  • Roadworks Ahead / 80km / Reduce Speed

  • Roadworks Ahead / 60km / Reduce Speed

  • Roadworks Ahead

  • Workmen Ahead / 60km / Reduce Speed

  • Workmen Ahead / 60km Ahead / Reduce Speed

  • Workmen Ahead / 40km Ahead / Reduce Speed

  • Workmen Ahead

  • Traffic Controller / Prepare to Stop / Do Not Overtake

  • Traffic Controller / 60km / Prepare to Stop

  • Traffic Controller / 40km Ahead / Prepare to Stop

  • Speed Sign 40km, 60km, 80km<br>(indicate which sign)

  • End Roadworks / Speed / Drive Safety

  • Lane Closure<br>(indicate number of lanes)

  • Mowing Ahead

  • Other Signs / Devices utilised<br>(include details of signs)

  • Overall Comments regarding Contractor's Traffic Set-up?

Audit Sign-off

  • Pass/Fail

  • Inspector

  • Date of Audit completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.