Title Page

  • Store Name:

  • Conducted on

  • Prepared by

  • Location
  • Personnel in attendance

Induction / Arrival

  • All operatives signed in with the Store Manager / Supervisor?

  • Induction completed with Store / IBM engineer?

  • Asbestos report reviewed and removal works to continue?

  • IBM engineer in attendance?

ATM information

  • Serial number of ATM's

  • Is the fascia signage illuminated?

  • Can a safe power isolation be completed within the ATM room?

Fascia information

  • Is there existing NatWest / RBS fascia signage installed?

  • Picture of the associated ATM's and existing Fascias. (Machine 1)

  • Picture of the associated ATM's and existing Fascias. (Machine 2)

Completion

  • Picture of ATM's post fascia removal - External (1)

  • Picture of ATM's post fascia removal - External (2)

  • Picture of ATM's post fascia removal - External (3)

  • Completion photo of internal confirming condition of making good / isolations.

  • Is there any making good works required? (Including picture)

  • Completion photo confirming area left in a clean and safe manner

  • Completion signature of Supervisor

  • Confirm all operative's have signed out of the store prior departure from site

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.