Title Page
-
Store Name:
-
Conducted on
-
Prepared by
-
Location
-
Personnel in attendance
Induction / Arrival
-
All operatives signed in with the Store Manager / Supervisor?
-
Induction completed with Store / IBM engineer?
-
Asbestos report reviewed and removal works to continue?
-
IBM engineer in attendance?
ATM information
-
Serial number of ATM's
-
Is the fascia signage illuminated?
-
Can a safe power isolation be completed within the ATM room?
Fascia information
-
Is there existing NatWest / RBS fascia signage installed?
-
Picture of the associated ATM's and existing Fascias. (Machine 1)
-
Picture of the associated ATM's and existing Fascias. (Machine 2)
Completion
-
Picture of ATM's post fascia removal - External (1)
-
Picture of ATM's post fascia removal - External (2)
-
Picture of ATM's post fascia removal - External (3)
-
Completion photo of internal confirming condition of making good / isolations.
-
Is there any making good works required? (Including picture)
-
Completion photo confirming area left in a clean and safe manner
-
Completion signature of Supervisor
-
Confirm all operative's have signed out of the store prior departure from site