Title Page
-
Audit Title
-
Conducted on
-
Prepared by
- Deji Oladejo
- Yita Choong
- Leon Oriti
- Jonothan Poon
- Alasdair Cameron
- Carlos Figueroa
-
Contractor
-
Stage / Region
- New South Wales
- Australian Capital Territory
- Victoria
- Tasmania
- Queensland
- South Australia
- Western Australia
- Northern Territory
-
Accompanied By
-
Site Name
-
Site ID
-
Board ID
-
DB Name
-
Building ID
-
Building Name
A. Pre Inspection (Desktop Analysis)
-
A1 Review original Audit recommendations.
-
A2 Review contractor’s Dilapidation report.
-
A3 Review Inspection Test Plans (Testing & <br>Commissioning docs).
-
A4 Review Shop and As-Built drawings.
B. VISUAL INSPECTION (ON-SITE) – NEW DISTRIBUTION BOARDS
-
Were the works complete at the time of inspection?
B.2 General Overall Condition
-
B2.1 Check DB label, danger notices, warning notices, <br>instructions (and similar information) are correctly <br>and adequately provided and fitted.
-
B2.2 Check that DB is mounted securely and there are no obstructions
-
B2.3 Check that mounting height and clearance around <br>the DB is satisfactory.
-
B2.4 Check DB has no visible physical damage.
-
B2.5 Check DB is clean and free of loose objects.
B3 With DB Door Open
-
B3.1 Check provision of metering, surge diverters, <br>emergency lighting test switch (if applicable) are <br>installed.
-
B3.2 If Fire indicator panel (FIP) circuit is present ensure <br>warning label is present
-
B3.3 If emergency lighting test switch is present ensure <br>warning label is present
-
B3.4 Check that circuit schedules and circuit labels are <br>completed.
-
B3.5 Check current rating and function of each circuit is <br>correct and matches circuit schedule.
-
B3.6 Check escutcheons panel cut-outs are suitably <br>sized.
-
B3.7 Check door gaskets seals are not damaged
-
B3.8 Check pole fillers are provided to spare poles.
-
B3.9 Check door can be open and closed smoothly
-
B3.10 Check door lock can be locked and unlocked <br>smoothly, and key is available.
-
B3.11 Check cables (entering & existing DB) are <br>adequately fixed, supported and glands provided.
-
B3.12 Check a minimum of 30% spare pole spaces <br>together with pole fillers provided.
-
B3.13 Check DB installation is in line with the Shop/ As-<br>built drawings. (If no, mark up deviations on the <br>drawings)
C. VISUAL INSPECTION (ON-SITE) – REPLACE WITH RCD – LIKE-FOR-LIKE
-
C1Check RCBO’s have been installed to the power <br>circuits as per the auditor’s recommendations (or <br>Dilapidation report).
-
C2 Check that RCBO’s have been mounted and <br>installed correctly.
-
C3 Cross-check with circuit schedule that all power <br>circuits are provided with RCD protection.
-
C4 Check that circuit schedules are provided
D. INSPECTION NOTES
-
Notes
IMAGES
-
Generally images should contain clear image of: • Distribution Board & ID Label • Close-up of internal of DB • Circuit Schedule • General surrounds around the Distribution Board