Title Page
-
Project and Turbine Number:
-
Customer:
- NextEra
- MEC
- Leeward
-
Site:
- Horse Hollow 3
- Red Canyon
- Cap Ridge
- Victory
- Sweetwater 2
- Sweetwater 3
-
Generator Serial Number:
-
Conducted on
-
Prepared by
-
Personnel
- Anthony Noble
- Patrick Fisher
- Shane Griffin
- Nick Addis
- Lane Tillman
- Devyn Harvey
- Daniel Camacho
- Tyler Franich
- Lynn Lawson
- Josh Melindez
- Nathan Bronson
- Christian Cooper
- Tim Hanson
- Danny Lebaron
- Henry Lebaron
- James Ray
- Jaremy Ray
- Justin Ray
- Ryan Ray
- Chuck Roundy
- Vernon Stubbs
- Paul Jungmeyer
- Brandon Stephens
- Mike Morton
- Richard Jenkins
- Alvin Carroll
- Mike Lozano
- Justin Mitchell
- Ryan Pearl
- Vernon Stubbs Jr
- Derek Stubbs
- Jimmy Peacock
- Manny Cordova
- Nick Parsons
- Scott Janzen
- David Hanson
- Devin Pitts
- Dustin Williams
- Phillip Cortez
- Stasi Rogers
- Max Palma
- Travis Stubbs
- Nathen Bronson
- Aaron Carroll
- AJ Arthur
- Edward Romero
- Jethro LeBaron
- Geronimo LeBaron
- Jerry Garcia
- Tracey Butts
- Michael Stull
- Lawrence Bartley
- Ram Garcia
- Jarvis McCann
-
Additional Personnel
Job
-
Tolerances
Bearing Journal DE/NDE
150 (+.040/-0.015
Bearing Housing DE/NDE
320 (+0.036)-0
Heater Resistant: Roughly 400 Ohms for Hitachi. Roughly 500Ohms for Winergy and Lohers.
PT100's Resistance: Roughly 100 Ohms
Slip Ring run out: <0.2mm
1. Generator Details:
-
Serial Number
-
Name Plate
-
Generator Type
- Hitachi
- Vem
- Winergy
- Loher
- Toshiba
2. Generator Exterior
-
Was the shock sensor activated?
-
Generator Conditon Tests:
-
PT 100 Sensors and Generator Heaters passed Resistance Test?
-
Generator Fans operating properly?
-
Micro Brush Switches Pass initial continuity test?
-
If no, check off when corrected.
-
Initials
-
Micro Brush Arms are undamaged?
-
If no, check off when corrected.
-
Initials
-
Passed Pre-Refurb AWA test on both stator and rotor?
-
Passed Post-Refurb AWA test on both stator and rotor?
-
Shaft run out of spider within .05mm tolerance?
-
CMS Holes drilled on both NDE and DE bearing end plates?
-
Finished photos of CMS with paint removed
-
Exterior Before
-
Findings
-
Exterior After
-
Completed:
-
Initials
-
Stator Box Before
-
Stator Box After
-
Completed:
-
Initials
-
Rotor Box Before
-
Rotor Box After
-
Completed:
-
Initials
3. Brush Box
-
Brush Box Before
-
Brush Box After
-
Completed:
-
Initials
4. Brushes and Springs
-
Are the brushes the right brushes for the generator?
-
Replace brush springs
5. Slip Ring
-
Original Slip Ring SN
-
If reusing original slip ring, has it passed the Resistance test and is with in the phase/ground ring wear tolerance?
-
Original Slip Ring SN
-
Slip ring run out when assembled: K,L,M,G
-
Is the slip ring runout within spec?
-
Check when corrected
-
Initials
-
Replacement Slip Ring SN
-
Replacement SN
-
Provide slip ring runout for K,L,M,G rings
-
Are all joints tightened to required torqued, checked and paint penned?
-
Initials
5. Generator - Internal
-
Drive End Internal Before
-
Drive End Internal After
-
Completed:
-
Initials
-
Non-Drive End Internal Before
-
Non-Drive End Internal After
-
Completed:
-
Initials
-
Are the interior stator cables free of damage/defects?
-
Any debris in the interior of the generator?
6. Bearings
-
Note: The serial Number is not the 6330,6326' or the 6332. These are the model number. The serial is usually etched in and is 2 to 5 numbers.
-
Drive end Original Bearing SN
-
Initials
-
Drive end Replacement Bearing SN
-
DE Bearing Housing width and journal in tolerance?
-
Completed:
-
Initials
-
NDE Original Bearing SN
-
Initials
-
NDE Replacement Bearing SN
-
NDE Bearing Housing width and journal in tolerance?
-
Completed:
-
Initials
7. Wye Ring
-
Note: WYE ring repair not required on Vem, Loher or Winergy.
WYE ring repair required on Hitachi -
Did it require a wedge repair?
-
Did the generator require a re-lead?
-
Does the generator require a wye ring retrofit/repair?
-
Exposed Connections prior to drilling or cutting (3)
-
Crack(s) found?
- Single
- Multiple
- No
-
Pictures of Crack(s)
-
Initials
-
Isolated Connections with silver plating (3)
-
Initials
-
Pictures of Shim Stacks(3)
-
Bolt length position 1:
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
-
Shims for position 1:
- 6.35mm
- 6.35mm
- 7.11mm
- 7.11mm
- 7.87mm
- 7.87mm
- 8.63mm
- 8.63mm
- 9.65mm
- 9.65mm
- 10.41mm
- 10.41mm
- 11.17mm
- 11.17mm
- 11.93mm
- 11.93mm
- 12.70mm
- 12.70mm
- 13.46mm
- 13.46mm
- 14.47mm
- 14.47mm
- 15.24mm
- 15.24mm
- 16.00mm
- 16.00mm
-
Bolt length position 2:
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
-
Shims for position 2:
- 6.35mm
- 6.35mm
- 7.11mm
- 7.11mm
- 7.87mm
- 7.87mm
- 8.63mm
- 8.63mm
- 9.65mm
- 9.65mm
- 10.41mm
- 10.41mm
- 11.17mm
- 11.17mm
- 11.93mm
- 11.93mm
- 12.70mm
- 12.70mm
- 13.46mm
- 13.46mm
- 14.47mm
- 14.47mm
- 15.24mm
- 15.24mm
- 16.00mm
- 16.00mm
-
Bolt length position 3:
- 50mm
- 55mm
- 60mm
- 65mm
- 70mm
-
Shims for position 3:
- 6.35mm
- 6.35mm
- 7.11mm
- 7.11mm
- 7.87mm
- 7.87mm
- 8.63mm
- 8.63mm
- 9.65mm
- 9.65mm
- 10.41mm
- 10.41mm
- 11.17mm
- 11.17mm
- 11.93mm
- 11.93mm
- 12.70mm
- 12.70mm
- 13.46mm
- 13.46mm
- 14.47mm
- 14.47mm
- 15.24mm
- 15.24mm
- 16.00mm
- 16.00mm
-
Completed Installation
-
Completed:
-
Initials
-
Notes
8. Balance
-
Note: Balancing not required on Vem, Loher or Winergy.
-
Does the generator require balancing?
-
Initial Imbalance (mm/s)
-
Initial Imbalance (mm/s)
-
Weight(s) Applied (g) and location:
-
Final Balance Amplitude < 0.08 mm/s
-
Final Balance
-
Completed:
-
Initials
9. High Speed Coupler
-
KTR 80.00mm (+-.30)
Flender Flush -
Before
-
After
-
Completed:
-
Initials
10. Additional Notes/Findings
-
Notes
-
Findings