Title Page

  • Document No.

  • Customers name

  • Customers email address

  • Date

  • Prepared by

  • Job number

  • If customer can not provide a email address please print and give a hard copy. If customer can privilege a email address please avoid using the printer.

Cylinder

  • Cylinder servicing

  • Cylinder one

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

  • Cylinder two

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

  • Cylinder three

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

  • Cylinder four

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

  • Cylinder five

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

  • Cylinder six

Cylinder information

  • Make

  • Serial number

  • Description

  • Model

  • Add media

  • Size

  • Working pressure

  • Test pressure

  • Recommendarions / Defects

  • Cylinder empty

  • Valve blocked

  • External condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

  • Internal condition as received

  • Recommendations / Defects

  • Blast cleaning required

  • Add media

Valve

  • Cylinder thread

  • Din thread

  • Replace valve

  • Valve & cylinder threads match

  • Type

  • Add media

Wall thickness

  • Manufacturers min wall thickness

  • Measured wall thickness

  • Pass / Fail

  • Hydrostatic test

  • Initial reading (I) in ml

  • Test expansion (E) in ml

  • Pressure released (R) in ml

  • Permanent set R - I / Ex 100 Answer in %

  • Less then stated % (or 5%)

  • Pass / Fail

  • Cylinder destroyed

  • Cylinder destroyed

  • O2 Clean

  • O2 Clean valve

  • O2 Clean cylinder

  • Comments

Completion Q & A

  • New O ring

  • Dry

  • PTFE

  • Re-valve

  • Torque

  • Stamp

  • Decal

  • Replace all boots stage kits etc

  • Next cylinder test date

  • Fill pressure

  • Fill gas

  • Final assessment

  • Service Technician

Regulator

  • Regulator serving

  • Regulator one

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Regulator two

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Regulator three

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Regulator four

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Regulator five

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Add media

  • Regulator six

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

  • Regulator Seven

Regulator

  • Make

  • Model

  • Description

  • Orientation

  • First stage serial number

  • Second stage serial number

  • Octopus serial number if fitted

  • Gauges / Console

  • BCD Hose

  • Dry suit hose

  • Booking in notes

  • Add media

Inspection

  • Inspect for visual damage or signs of tampering

  • Add media

  • Visual inspection of hoses for wear, bulges, leaks and/or cracks

  • Add media

Prior to disassemble

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Notes

  • Disassemble corresponds with manufacturers drawings

  • Add media

Service

  • Dismantle, clean dry and re-inspect

  • Any parts requiring replacement apart from service parts

  • Reassemble 1st stage

  • Reassemble 2nd stage

  • Reassemble Octopus

  • Reassemble hoses in correct orientation

Once reassembled

  • Lock up pressure in Bar

  • 2nd stage crack pressure in mmH2O and/or behaviour

  • Octopus crack pressure in mmH2O and/or behaviour

  • Wet and dry tests

  • All remedial works completed and hp O rings replaced

Completion Q&A

  • Old parts bagged

  • All adjustments to manufacturers settings

  • Connections tight

  • Notes

  • Works complete

  • Date

  • Technicians name

Dry suit

  • Dry suit

  • Description of works carried out

  • Pressure test

  • Further work required

  • All works complete

  • Add media

  • Completed

  • Service technician

BCD

  • BCD service

  • Inflators serviced

  • Dump valves

  • Pressure test

  • Works completed

  • Add media

  • Completed

  • Service technician

Computer

  • Computer

  • Computer working when received

  • Add media

  • Description of work carried out

  • Computer pressure test

  • Please note pressure test will leave a 50m

  • Work completed

  • Add media

  • Date

  • Service technician

Other

  • Other works

  • Description of works

  • Add media

  • Service technician

Invoice

  • Invoice required

  • REC 2 TEC SERVICING INVOICE

  • Work carried out description

  • Total

  • PAYMENT DETAILS

    BANK transfer C Matcham A/c number 03746380 Sort code 20-53-31
    CASH

    Thank you

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.