Information
-
Audit Title
-
Add media
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Part 1: GENERAL INFORMATION
The responsible person for fire safety
-
Name of the responsible person
-
Contact details of responsible person
1 The Building
-
Number of above ground floors:
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Number of below ground floors:
-
Number of exits from below ground floors:
-
Is it possible to vent heat and smoke from the basement
-
Is there access to the roof voids?<br>(Check for evidence of smoking, suitability of edge protection and roof lights)
-
Floor area: (m2 per floor)
-
Floor area: (m2 total)
-
Brief details of construction: (Consider services, lift shafts, false ceiling voids, fire resisting materials and poorly fitting doors)
-
Occupancy type:
-
Curriculum activity in this building (Please detail activity by floor)
-
Curriculum types in adjacent buildings (Consider fire spread from adjacent buildings)
2 The occupants
-
Maximum number of occupants: (This is the maximum number of people possible to house in the building)
-
Maximum number of occupants at any given time:
-
Maximum number of members of the public at one time:
3 Occupants at special risk
-
Are there sleeping occupants?
-
Are there adequate arrangements for the safe evacuation of sleeping occupants?<br>
-
Are there disabled occupants?<br>(Consider sight, hearing and mobility issues)
-
Are systems in place to alert and assist disabled occupants in the case of a fire?
-
State locations of all refuge areas and details of suitability:
-
Are evac chairs available?
-
Can the lifts be used in an emergency by a disabled person?
-
Are there occupants in remote areas?<br>(Basements, cellars, roof spaces, lift shafts, plant rooms)
-
Are there any persons who work alone in the building?
-
Are there any areas that may be remote due to out of hours working?
4 Previous Fire loss experience
-
Can you confirm there has been no previous history of fire loss in the premises (give details if there has)
-
Can you confirm there haven't been any fires in buildings next door, connected or in close proximity?
-
Can you confirm there have been no near misses accidents involving fires?
-
Have there been any fires or explosions which has resulted in closure of plant for more than 24hrs as reportable to RIDDOR.
-
There has been NO escape of flammable gases or other flammable substances from the processes carried out on the premises?<br>(If there has please give details)
-
Can you confirm there have not been any complaints regarding fire safety from staff, students, visitors or contractors?<br>(Please give details)
-
Has there been any advice given regarding fire safety issues from any of the following sources?
-
Fire authority, HSE/EHO<br>(Please give details)
-
Union or non union safety reps<br>(Please give details)
-
General health and safety inspections
5 Other relevant background
-
Is there a prohibition notice in force? (if yes give date of issue)
-
Is there an alteration notice in force? (if yes give date of issue)
-
Is there an enforcement notice in force? (if yes give date of issue and date of when work is to be completed by)
Part 2: FIRE HAZARDS AND ELIMINATION OR CONTROL
6 Electrical sources of ignition
-
Are reasonable measures taken to prevent fires of electrical origin?
-
Is the fixed wiring installation periodically tested and inspected by a competent person?
-
Are portable appliances tested/inspected?
-
Is there a suitable policy about the use of personal electrical appliances?
-
Is there a suitable limitation on the use of trailing leads and adapters?
-
Is all electrical equipment tested and records on site
7 Smoking
-
Are reasonable measures taken to prevent fires as a result of smoking?
-
Are there suitable arrangements made for those who wish to smoke?
-
Is there absence of any evidence of breaches of smoking policy?
-
Is the appropriate smoking prohibition notice displayed at the building's entrance?
8 Arson
-
Does the basic security against arson appear reasonable?
-
Is there sufficient control of unnecessary fire load in close proximity to the building or available for ignition by outsiders?
-
Are there any records of any break in's to this or adjacent buildings?
-
Are refuse areas sited away from buildings and are they adequately secured?
9 Portable heaters and heating installation
-
Is the use of portable heaters avoided as far as reasonably practicable?
-
If portable heaters are used, are the more hazardous types (radiant bars and LPG) avoided?
-
If portable heaters are used, are suitable measures taken to minimise the risk of ignition of combustible materials?
-
Have all portable heaters been PAT tested?
-
Are emergency escape routes free from portable heaters?
-
Are fixed heating installations subject to regular maintenance?
10 Cooking facilities
-
What types of cooking appliances are in use on the premises?
- microwaves
- conventional ovens - gas
- conventional ovens - electric
- hot plates
- deep fat fryers
- grills
- toasters
-
Are there any kitchen tools/appliances that generate a flame (blow lamps)?
-
Are reasonable measures taken to prevent cooking fires?
-
Are filters changed and ductwork cleaned regularly?
-
Are cooking appliances regularly maintained?
-
Does regular cleaning take place to remove crumbs and other combustible materials?
-
Are suitable extinguishers available?
11 Lightning
-
Does the building have lightning protection system if required? (if yes has it been tested and are records of testing kept)
12 Other significant ignition sources that warrant consideration
-
Are halogen lamps situated away from combustible materials?
-
List other ignition sources:
13 Housekeeping
-
Are combustible materials separated from ignition sources?
-
Is the unnecessary accumulation of combustibles and waste avoided?
-
Are combustible materials stored appropriately?
-
Do inspection reports include details of standard of housekeeping?
14 Hazards introduced by contractors or in house building works
-
Is there an approved list of contractors in use?
-
Are contractors subject to pre-qualification and selection procedures?
-
Are risk assessments and method statements approved prior to contractors coming on site?
-
Is there sufficient control over works by contractors (e.g. Permits to work & hot works permits)?
-
Are safety conditions and college instructions/procedures communicated to contractors?
-
Do contractors control the hazardous substances that they bring on site
15 Dangerous Substances (DSEAR related)
-
Are dangerous substances present on the premises?
-
Are there procedures and safe storage in place for dangerous substances?
-
Has the risk to relevant persons been adequately eliminated or reduced?
-
Are there arrangements for the safe storage and use of compressed gas cylinders and piped systems?
-
Are pyrotechnics used?<br>(If yes please give details including storage)
16 Hazardous Substances (COSHH related)
-
Is there an inventory of hazardous substances kept in the building?
-
Is there appropriate storage of hazardous materials?
Part 3: FIRE PROTECTION MEASURES
17 Means of escape
-
Is the building provided with adequate means of escape in case of fire?
-
Are there sufficient exits?
-
Are exits easily and immediately openable where necessary?
-
Do fire exits open in the direction of travel where necessary?
-
Have sliding or revolving doors been avoided as fire exits?
-
Are there adequate means of securing exits?
-
Are there reasonable distances of travel where there is a single direction of travel?
-
Are there reasonable distances of travel where there are alternative means of escape?
-
Are escape routes adequately protected?
-
Are there suitable fire precautions for all inner rooms?
-
Are escape routes unobstructed?
-
Are there suitable means of escape for disabled occupants?
-
Are there any known obstructions to escape routes for disabled employees or visitors?<br>(Stairs, steps etc)
18 Measures to limit fire spread and development.
-
Is there a sufficient standard of compartmentation and sub-compartmentation?
-
Are linings that promote fire spread avoided as far as reasonably practicable?
-
Are all services, particularly new ones being sealed with approved fire stopping?
-
Have fire shutters/curtains been installed as part of the fire compartmentation?
-
If shutter or curtain systems are installed are they manual or automatic?
-
Are shutters/curtains suitably maintained?
-
Do any ceiling/wall voids prevent fire spread?
-
Have false ceilings been avoided within the building?
-
Are open stairways protected?
-
Do all doors, particularly fire doors fit, seal and close properly?
19 Escape lighting
-
Is there a reasonable standard of escape lighting provided?
-
Does an emergency lighting operate effectively on failure of the normal power supply?
-
Is an annual discharge completed on the emergency lighting system?
20 Fire safety signs and notices
-
Are fire safety signs and notices suitable and sufficient?<br>(Signs should be of the same type)
-
If lifts cannot be used in a fire is there suitable signage to indicate this?
-
Are fire extinguishers, hose reels and other fire equipment points well signed?
21 Means of giving warning in the event of fire
-
Is a manually operated electrical fire alarm system provided?
-
Is the alarm system a single stage or linked fire alarm?<br>(Single - rings in whole building, linked - rings in main building and will ring in adjacent if detectors in particular areas are activated)
-
Are all call points visible and unobstructed?
-
Is automatic fire detection provided?
-
Is there remote transmission of alarm signals?
-
Does the alarm system give both visual and audio signals?
-
Can alarms be heard in all parts of the building including remote areas?
-
Have there been any issues relating to the fire alarm system?<br>(If yes please give details)
-
Have there been any false alarms or hoax calls that have resulted in fire brigade attendance?
22 Manual fire extinguishing appliances
-
Is there suitable and sufficient provision of portable fire extinguishers?
-
Which types of extinguishers are available in the building?
- water
- foam
- CO2
- powder
- wet chemical
- blankets
-
Are extinguishers suitably located? <br>(Travel should be less than 30m)
23 Relevant automatic fire extinguishing systems
-
Type of system:
-
Comments and observations:
24 Facilities, equipment and devices for the protection of Fire-Fighters
-
Types of facilities:
-
Comments and observations:
Part 4: MANAGEMENT OF FIRE SAFETY
25 Procedures and arrangements
-
Person responsible for fire safety:
-
Are there competent persons available to assist in implementing fire safety arrangements?
-
Are appropriate fire procedures in place? (including arrangements for calling the fire service)
-
Fire Policy in place and details recorded?
-
Is the Fire policy up to date and regularly updated?
-
Is the Fire Policy readily available for staff to read?
-
Is the Fire Policy available to the enforcing authority?
-
Are there persons nominated to respond to fire?
-
Are persons nominated to assist with evacuation?
-
Is there appropriate liaison with the fire service?
-
Do routine in-house inspections of fire precautions take place?
-
Are routine fire inspections/fire risk assessments sent to relevant senior managers?
26 Training and drills
-
Are staff given instruction on induction?
-
Is the evacuation of persons at special risk covered by health and safety/fire safety training?
-
Do staff receive periodic refresher training at suitable intervals?
-
Are staff with special responsibilities given appropriate training?
-
Are staff trained in the use of fire extinguishers?
-
Are fire drills carried out at appropriate intervals?
-
Have there been any issues regarding fire safety recorded/noticed during fire drills? (If yes please give details)
-
Have staff responsible for fire inspections been suitably trained?
-
Do visitors receive information regarding fire safety when they arrive on site?
27 Testing and maintenance
-
Is there weekly testing and periodic servicing of the fire detection and alarm system?
-
Is there monthly, six-monthly and annual testing of the emergency lighting?
-
Is there annual maintenance and testing of fire extinguishing equipment?
-
Is there annual inspection and test of the lightning protection system?
-
Is there six monthly and annual testing of wet/dry risers?
-
Is there weekly testing and periodic inspection of sprinkler installations?
-
Is there routine checks of fire doors and final exit doors?
-
Other relevant inspection and test
28 Records
-
Are there records of fire drills?
-
Are there records of fire training?
-
Are there records of fire alarm tests?
-
Are there records of emergency lighting tests?
-
Are there records of maintenance and testing of other fire protection systems?
Part 5: RISK RATING AND RECOMMENDATIONS
Risk Items
-
Item 1
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 2
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 3
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 4
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 5
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 6
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 7
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 8
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 9
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Item 10
-
Add media
-
Probability (likelihood of fire)
-
Consequence (impact on life safety)
-
Risk rating score (probability x consequence)
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
-
Recommendations
-
Action
-
Received by responsible person / representative
-
Assessor Signature
-
Pictures
Re-Assessment
-
Recommended date for re-assessment