Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Inspection
-
Has the last inspection been reviewed
-
Are there any outstanding actions
HGR Personnel
-
Have proper work attire on (boots, shirt tucked in, jeans)
-
Have tape measure, pen and note pad on person
-
Employees aware of emergency procedures
HGR Trailer Checklist
-
HGR sign in sheet and badges utilized
-
Are site rules on display
-
Is there a copy of the jobsite policy signed and dated by all forman onsite
-
Is there a version of the Construction Schedule posted
-
First aid kit fully stocked
-
OSHA Postings
-
Emergency numbers / contacts posted
-
Weekly Toolbox talks
-
MSDS from all subcontractors
-
Does the Superintendent have proper tools needed
-
Map to nearest emergency center posted
-
Job site address posted in trailer, are all field personal aware and capable of giving directions to emergency crew
Plans
-
Are the As-Builts up to date and properly maintained
-
Are there any outstanding RFI's
-
Are all addendum's present for trades to review
General house keeping
-
Site Illumination-are there any existing exterior lighting in need of service
-
Are areas by trailers and dumpster clean
-
Any trash left outside due to dumpster being overfilled needs to be on pallets and covered and taped with 4mil plastic.
-
Are the toilet areas clean and adequately equipped
-
Are "No Smoking" signs posted where needed
-
Is the dirt removed from trench locations properly stored and covered to minimize washout
-
Are lifts cleaned off before exiting building
-
Are all lifts diapered, have light colored tires, parked in one location<br>
-
Make sure no lifts are parked on top of grease traps and are not blocking generators or other Publix serviceable items
-
Is delivery area clear of vehicles prior to morning deliveries
-
Are work areas being managed safely
-
Is there provision to minimize dust on product
-
Is general neatness of working areas acceptable
-
All areas need to have plastic covering all ceiling openings and raw drywall in all prep areas and departments
General scope items to review
-
Are floor openings properly covered with plates, secured, carpeted and taped down
-
Are trench widths adequate for pipe size/type
-
Is compaction equipment adequate to achieve specified results
-
Are all materials being installed in accordance with design specification
-
Is caulk and grout being used at all pipes and fixtures mounted on walls and floors
-
Is temporary storage of materials and supplies done in a organized fashion
-
Verify no equipment is set in place unless it is completely operational
-
Verify all equipment is onsite a week prior to change out
-
Does all equipment fit under soffit and is ansul system located in the right places
-
Make sure on all temp doors at restrooms and pharmacies use a slide bolt or hasp with twist knob
-
Lockout procedures utilized
-
All electrical panels have covers on, if not is electrical personal within 20' line of sight.
-
Electrical junction boxes closed every night
-
Are extension cords being used free from nicks, gouges, cuts and have proper grounding
-
Call in for additional dumpster on nights of extensive demo or equipment change out
Recurring punch list items
-
All old caulking and wall anchors have been removed and penetrations have been filled
-
Verify all restroom flush valves are plumb and level
-
Verify all new toilets are straight and secured with grout around bowl
-
Stainless steel screws are being used in all sinks and legs
-
In all departments verify all newly installed flooring is siliconed to wall finishes
-
Verify all new sprinkler heads install in coolers and freezers are installed per detail
-
Verify all new roof top equipment is installed with stainless screws
-
Verify any and all new roof top refrigeration equipment is welded completely
Deliveries
-
Owner deliveries
-
HGR deliveries
-
Subcontractor deliveries
-
Make sure no material is being stored inside
-
Under no circumstances is Publix equipment to be used by non Publix personal (I.e. shopping carts, birds, pallet jacks, floats)
Overall
-
What are some positive findings for site
-
What are some opportunities for improvements on site
-
Do we have any upcoming challenges that we need to keep an eye on
Management review
-
Is general overall cleanliness acceptable
-
Is proper notification (at least 48 hours) given prior to when areas need cleared
-
Is back door access being properly maintained
-
Does store personal have any concerns
Sign Off
-
On Site representative
-
Owner representative
-
Auditor's Signature