Information
-
Site conducted
-
MIF.14A Lagging & Labelling
-
Audit Title
-
CILANTRO ENGINEERING
MIF.14A - Lagging & Labelling
-
Client: McLaren
-
Project: Repton Gardens
-
Date and Time
-
Building
-
Level:
Inspection Description
-
Is the material correct to specification?
-
All BCWS Pipework Lagged with the correct insulation?
-
All LTHW Pipework Lagged with the correct insulation?
-
BCWS Pipework Labelled with Flow Direction?
-
LTHW Pipework Flow And Return Labelled?
-
Have tape been used to cover all gaps in between lagging?
-
Are all ID labels applied? (Flow/return/BCWS)
SIGN OFF
-
IS THE INSTALLATION COMPLETE AND FREE OF SNAGS
-
SNAG LIST
-
COMMENTS / ADDITIONAL INFORMATION
-
Subcontractor Supervisor Name and Signature
-
Cilantro Manager Name and Signature
-
PICTURES