Title Page

  • MMC Job Number

  • Enable Order Number

  • RSP

  • Conducted on

  • Prepared by

  • Location/Address
  • Technician

  • Add signature

FAP

  • Reseal Required

  • Add media

  • Brownfields

  • Greenfields

Property Type

  • SDU

  • MDU

  • ROW

CIVILS

  • Trench

  • Thrust

  • Fence Line

  • Pro-Active Lead in

  • Other

  • Add media

  • Has there been any variation to scope?

ETP

  • Installed to standard

  • Add media

Internal Cable Install.

  • Underfloor Install

  • Roof space install

  • Back to Back install

  • Other

  • Add media

  • Has there been any variation to scope?

ITP

  • Installed to standard

  • Add media

ONT & RGW

  • ONT installed, provisioned & connected correctly

  • RGW installed to RSP standard

  • Add media

Heath and safety

Systems and Facilities

Documents

  • 1.1. Onsite H&S rep named in Tailgate?

  • 1.2. SSSP in vehicle?

  • 1.3. Notifiable works? (As per regs) Specifically Asbestos and Overhead Power

  • 1.4. Are approvals in job pack?

  • 1.5. Is there a hazard register?

  • 1.6. Has it been completed for the site updated?

  • 1.7. Accident/Incident register supplied?

  • 1.8. Is the accident register being maintained? Up to date?

  • 1.9. Are accidents/incidents being investigated?

  • 1.10. Is there an up to date competency register?

2. Hazard Management

  • 2.1. T/A for Task?

  • 2.2. Hazardous Substances?

  • 2.3. MSDS Register and MSDS available?

  • 2.4. Is there evidence of toolbox completed daily and at startup?

  • 2.5. Is there evidence of weekly safety inspections or on jobs 3 days or over?

  • 2.7. Is a work permit system used? i.e. Hot works.?

  • 2.8. Are all electrical items current test tagged?

  • 2.9. Are all fall hazards managed effectively/as required?

  • 2.10. Is there a site specific emergency plan?

  • 2.11. Additional hazards observed?

  • 2.12. Additional hazards observed?

3. Training

  • 3.1. First aider current certificate?

  • 3.2. Inductions held?

  • 3.3. Induction register up to date?

  • 3.4. Are there arrangements to induct visitors?

  • 3.5. Is the induction procedure site specific?

4. Personal Protective Equipment PPE

  • 4.1. Has mandatory PPE been specified?

  • 4.2. Is other PPE worn when required?

  • 4.3. Is other PPE in good condition?

  • 4.4. Other - is first aid kit and extinguisher available and up to date?

5. Hazardous Manual Tasks

  • 5.1. Lack of identification hazardous tasks, electrical high voltage chemicals

  • 5.2. T/A's being followed. Check at least one task

  • 5.3. Manual handling as per requirements?

6. Traffic Management

  • 6.1. Is there TMP on site?

  • 6.2. Has the TMP been approved by the local authority?

  • 6.3. Has the TMP set up been followed as per documentation?

  • 6.4. Is the TMP supervised by a qualified STMS

  • 6.5. Is there a traffic controller on site?

  • 6.6. If no TMP required is the temporary construction zone plan been set up properly?

7. Electrical Hazards

  • 7.1. Unsafe Electrical leads? (Damaged, out of test date or untested.)

  • 7.2. Lack of RCD protection?

  • 7.3. Contact with underground assets?

  • 7.4. Contact with overhead electrical lines?

  • 7.5. Overloading outlets?

  • 7.6. Electrical equipment near water?

  • 7.7. Electrical equipment near flammables.?

  • 7.8. Electrical equipment near chemicals that could cause damage?

  • 7.9. Electrical leads that may be damaged from contact with moving machinery parts or metal structures?

  • 7.10. Lack of lock-out/tag-out (LOTO) procedures for electrical equipment?

8. Additional Hazards

  • 8.1. Items in vehicles adequately secured when not in use?

  • 8.2. No loose clothing items or jewellery?

  • 8.3. Small tools being used safely and approved?

  • 8.4. Wheel chock in use as required?

  • 8.5. Phone use and media players/radios within policy

9. Environmental Hazards

  • 9.1. Lack of/or inadequate environment management plan (EMP)?

  • 9.2. Lack of/or inadequate, dust suppression system.

  • 9.3. All services identified?

  • 9.4. Lack of/or inadequate systems to prevent constraints entering storm water drains?

  • 9.5. Spill kit available?

Corrective Actions

  • Enter any corrective action that will be undertaken

Sign off

  • Onsite representative signature

  • Auditors signature

Summary

Summary

  • Install completed to standard?

  • Work completed as per scope?

  • Any damage to property?

  • Add media

  • CCR completed & signed?

  • QA passed

  • If Failed is there work to be rectified?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.