Title Page
-
MMC Job Number
-
Enable Order Number
-
RSP
-
Conducted on
-
Prepared by
-
Location/Address
-
Technician
-
Add signature
FAP
-
Reseal Required
-
Add media
-
Brownfields
-
Greenfields
Property Type
-
SDU
-
MDU
-
ROW
CIVILS
-
Trench
-
Thrust
-
Fence Line
-
Pro-Active Lead in
-
Other
-
Add media
-
Has there been any variation to scope?
ETP
-
Installed to standard
-
Add media
Internal Cable Install.
-
Underfloor Install
-
Roof space install
-
Back to Back install
-
Other
-
Add media
-
Has there been any variation to scope?
ITP
-
Installed to standard
-
Add media
ONT & RGW
-
ONT installed, provisioned & connected correctly
-
RGW installed to RSP standard
-
Add media
Heath and safety
Systems and Facilities
Documents
-
1.1. Onsite H&S rep named in Tailgate?
-
1.2. SSSP in vehicle?
-
1.3. Notifiable works? (As per regs) Specifically Asbestos and Overhead Power
-
1.4. Are approvals in job pack?
-
1.5. Is there a hazard register?
-
1.6. Has it been completed for the site updated?
-
1.7. Accident/Incident register supplied?
-
1.8. Is the accident register being maintained? Up to date?
-
1.9. Are accidents/incidents being investigated?
-
1.10. Is there an up to date competency register?
2. Hazard Management
-
2.1. T/A for Task?
-
2.2. Hazardous Substances?
-
2.3. MSDS Register and MSDS available?
-
2.4. Is there evidence of toolbox completed daily and at startup?
-
2.5. Is there evidence of weekly safety inspections or on jobs 3 days or over?
-
2.7. Is a work permit system used? i.e. Hot works.?
-
2.8. Are all electrical items current test tagged?
-
2.9. Are all fall hazards managed effectively/as required?
-
2.10. Is there a site specific emergency plan?
-
-
2.11. Additional hazards observed?
-
2.12. Additional hazards observed?
3. Training
-
3.1. First aider current certificate?
-
3.2. Inductions held?
-
3.3. Induction register up to date?
-
3.4. Are there arrangements to induct visitors?
-
3.5. Is the induction procedure site specific?
4. Personal Protective Equipment PPE
-
4.1. Has mandatory PPE been specified?
-
4.2. Is other PPE worn when required?
-
4.3. Is other PPE in good condition?
-
4.4. Other - is first aid kit and extinguisher available and up to date?
5. Hazardous Manual Tasks
-
5.1. Lack of identification hazardous tasks, electrical high voltage chemicals
-
5.2. T/A's being followed. Check at least one task
-
5.3. Manual handling as per requirements?
6. Traffic Management
-
6.1. Is there TMP on site?
-
6.2. Has the TMP been approved by the local authority?
-
6.3. Has the TMP set up been followed as per documentation?
-
6.4. Is the TMP supervised by a qualified STMS
-
6.5. Is there a traffic controller on site?
-
6.6. If no TMP required is the temporary construction zone plan been set up properly?
7. Electrical Hazards
-
7.1. Unsafe Electrical leads? (Damaged, out of test date or untested.)
-
7.2. Lack of RCD protection?
-
7.3. Contact with underground assets?
-
7.4. Contact with overhead electrical lines?
-
7.5. Overloading outlets?
-
7.6. Electrical equipment near water?
-
7.7. Electrical equipment near flammables.?
-
7.8. Electrical equipment near chemicals that could cause damage?
-
7.9. Electrical leads that may be damaged from contact with moving machinery parts or metal structures?
-
7.10. Lack of lock-out/tag-out (LOTO) procedures for electrical equipment?
8. Additional Hazards
-
8.1. Items in vehicles adequately secured when not in use?
-
8.2. No loose clothing items or jewellery?
-
8.3. Small tools being used safely and approved?
-
8.4. Wheel chock in use as required?
-
8.5. Phone use and media players/radios within policy
9. Environmental Hazards
-
9.1. Lack of/or inadequate environment management plan (EMP)?
-
9.2. Lack of/or inadequate, dust suppression system.
-
9.3. All services identified?
-
9.4. Lack of/or inadequate systems to prevent constraints entering storm water drains?
-
9.5. Spill kit available?
Corrective Actions
-
Enter any corrective action that will be undertaken
Sign off
-
Onsite representative signature
-
Auditors signature
Summary
Summary
-
Install completed to standard?
-
Work completed as per scope?
-
Any damage to property?
-
Add media
-
CCR completed & signed?
-
QA passed
-
If Failed is there work to be rectified?