Information
-
Conducted on
-
CitiPower/Powercor Contract Responsible Officer
-
Resource Partner (Contract Company)
-
Contract No / PM Order No
-
Location
-
Inspection No
-
Brief Description of Job
-
Prepared by
C - CUSTOMER SERVICE
C1 - Identification
-
List the names of all Traffic Controllers
Employee
-
Name
C2 - Passports & Authorities
-
Do ALL personnel have their relevant Authorities/Licences present?
-
Where applicable has site specific induction been performed?
Passport/Licence Authority Matrix
-
List the names of all Traffic Controllers
Employee
-
Name
-
Construction Industry Induction Card (e.g. White/Red Card)?
-
Traffic Management (3 yearly)?
-
Other?
C3 - Vehicle Signage
-
Do the vehicles have CP/PAL signage correctly displayed? (Only when working on CitiPower/Powercor related jobs)
-
List All Vehicles & Plant
Vehicles / Plant
-
Registration No. & Vehicle Type
C4 - Company Logo
-
Are the contract company employees wearing attire with their company logo clearly displayed? (Recommendation Only)
Q - QUALITY
Q1 - JSA Related Documentation
-
Are completed risk assessments available onsite?
-
JSA / Toolbox?
-
Traffic Plan?
-
Safe Work Method Statement?
-
Do the risk assessments reflect ALL hazards of the job and have the appropriate control measures been documented? (List additional risks as appropriate)
-
Does the work site reflect ALL the documented control measures?
-
Has the Traffic Control WSL signed onto the CitiPower/Powercor/Resource Partner JSA?
Q2 - Job File Documentation
-
Is sufficient information available to safely undertake the work? (e.g. Job file, location references, road speeds etc)
-
Is the job being performed in accordance with the Work Request?
H - HEALTH & SAFETY
H1 - Personal Protective Equipment
-
Are Hardhats being worn/available and within safety period? (Two (2) years from issue date)
-
Are Safety Boots being worn and in good condition?
-
Is High Visibility clothing/vest being worn?
-
Are Working Gloves required and/or worn?
-
Is Eye Protection required and/or worn?
-
Is Hearing Protection required and/or worn?
-
Is Sun Cream available and/or supplied?
H3 - Traffic Management
-
For which CitiPower/Powercor/Resource Partner is Traffic Control required?
-
In your opinion doe the Traffic Management Plan meet the requirements of Australian Standards & Vic Roads Code of Practice?
-
Is the Traffic Plan relevant for the work site and available?
-
Is the Traffic Plan a separate document or a linked Plan reference to the JSA?
-
Is the Traffic WSL qualified to draw a plan? (Traffic T/L must have RIIOHS205A Control traffic with a stop/slow bat & RIIOHS302A Implement traffic management plan or equivlent)
-
Are the appropriate traffic management signs & devices being used? (Class 1 Retro Reflective)
-
Advanced warning signs?
-
Worksite signs? (Symbolic Worker - Bright Orange)
-
Speed Indicator signs / Speed Advisory signs?
-
Traffic cones/bollards/barriers? (With Retro Reflective bands)
-
Detour signs / Road Closure signs?
-
Divergence signs?
-
Pedestrian signs?
-
Pedestrian Barriers? (e.g. Mesh fence)
-
Onsite traffic lights?
-
Electronic indicators/arrows?
-
Stop/Slow battens? (Identify signage used)
-
Is there a copy of the Traffic Memorandum of Authority ("Permission for works on the road") available and on site? (ALL Victorian Roads)
-
Is the Traffic signage monitored during the course of the work and has it been documented on the Traffic Plan and/or SWMS?
-
Has possible traffic congestion been considered and are sufficient measures in place to avoid it?
-
How does the Traffic Controller manage it?
-
Have the speed limits been determined correctly through the worksite?
-
Are worksite signs reflecting the actual job and used in conjunction with other traffic signs as required?
-
Are the worksite and vehicles adequately protected and clearances maintained between workers/vehicles and adjacent traffic?
-
Is the 600mm clearance being maintained between the extended EWP boom elbow and/or crane counter weight and cones/barriers/bollards?
-
Is the method of traffic/plant/pedestrian management on site suitable and effective?
-
Have two flags been placed in the initial approach & speed indicator signs? (Flags are only required in Multi Message signs)
-
Are signs in pairs where needed? (if required)
-
Have signs been placed on ALL approach roads? (if required)
-
Are ALL spaces in multi-message signs filled? (with reflective yellow black minimum)
-
Is the signage level & at least 200mm off the ground?
-
Is the signage in a reasonable condition and of the correct size?
-
Is the signage legible, safely placed and clear of obstructions?
-
Have rotation & rest periods of Traffic Controllers been considered? (Break every 2 hours)
H4 - Vehilces
-
Are the vehicle(s), (including trailers) in a clean and serviceable condition?
-
Is the vehicle presented in an appropriate & road worthy manner? (i.e. Visually check for broken tail lights / windscreen etc)
-
Is the vehicle cabin, load area clean & tidy?
-
Can equipment be securely restrained when in transit? (including trailers)
-
Are safety pins on trailers fitted and being used? (If applicable)
-
Are ALL vehicle warning lights/arrows operable and being used appropriately? (Flashing Lights need to be operating when in a designated work zone unless on Private Property or over 3 metres from edge of the road)
H5 - First Aid Kit
-
Is the First Aid Kit available and located by signage?
-
Is the First Aid Kit clean and tidy?
-
Are both content and audit checklists included in the First Aid Kit?
-
Has the First Aid Kit been audited & signed off by an appropriate person? (Once yearly - minimum)
-
Date First Aid Kit last checked:
-
Does the First Aid Kit contain the mandatory CPR Mask, Emergency Blanket and Disposal Gloves?
H10 - Work Practices
-
Were any unsafe work practices observed at the time of inspection?
E - ENVIRONMENTAL
E1 - Site Management
-
Are there any restrictions placed on entry to the property and/or roadway?
E3 - Vehicle Washing
-
Are vehicles clean? (e.g. No obvious mud or vegetation present on vehicles)
OVERALL INSPECTION COMMENTS:
-
Comments
COMMENTS REGARDING PREVIOUS NON-CONFORMANCES (if applicable):
-
Comments
NON-CONFORMANCE / OBSERVATION Raised
-
Non-Conformance
NC
-
Section
-
Identified Non-Conformance (Agree Corrective Action)
-
Responsible Person(s)
-
Date for Completion
-
Has a CARE been raised?
-
CARE Number:
-
Observation
OBs
-
Section
-
Identified Observation (Agree Corrective Action)
-
Responsible Person(s)
-
Date for Completion
-
Has a CARE been raised?
-
CARE Number:
Inspected Party Representative - CP/PAL Inspector - Observer (if appliacble)
-
Representative
Name
-
Name
-
Company / Position
-
Signature