Title Page
-
Partner
-
Property Address and/or LM Nr
-
Location
-
Identity of Any Sub-Contractors on Site
-
Partner Contact on Site
-
GFS Project / Site Contact
-
Date of Inspection
-
Inspection Undertaken By
-
Has the location given the correct address?
-
What is the correct address?
-
Brief description of project and activity on site during inspection
-
Document Number
Documentation
-
Are Works in Progress
-
Have you received a Recorded Site Induction or Safety Briefing from the person on site responsile for Health and Safety?
-
Are Project Specific Method Statements and Risk Assessments for current activities available and being followed?
-
Are COSHH Assessments or MSDS for materials being used available?
-
Is the Project Specific Design Documentation available?
Welfare Facilities
-
Are Works In Progress?
-
Is there provision for Welfare on Site?
-
What are the welfare arrangements on site? (Full Site Compound , Welfare Compound, Welfare Van, Chemical Toilet, Customer Facilities, Other)
-
Are welfare areas clean and well stocked with soap, paper towels and toilet paper? If customer facilities are being used, are they being treated respectfully?
Waste Management
-
Are Works in Progress?
-
If a skip is in use, is it an enclosed and lockable skip?
- Yes
- No
- N/A
-
Are waste transfer notices available on site for all project related waste?
-
Is waste cleared from residents properties to prevent a build up that could be a fire risk from arson or represent a trip hazard?
-
Are good waste management processes being followed?
General Site Condition and Health & Safety
-
Are works in progress?
-
Is signage displayed?
-
Is there a suitably stocked first aid box on site along with eye wash bottles?
-
Are materials stored in a correct manner to minimise any hazards?
-
Is the site in good order, tidy showing good housekeeping and free from potential trip hazards?
-
Are public footpaths and public rights of way unobstructed by tools, materials, or vehicles?
Asbestos
-
Was the property built before the year 2000
-
Is there a current R&D Asbestos Survey on site for the property detailing the areas of work?
-
is there asbestos present on site?
-
Have all those working on site been made aware of the location of asbestos?
-
Do all those working on site have asbestos awareness training?
Scaffolding
-
Is there scaffolding on this site?
-
Has the scaffold been erected by a qualified competent person? (training records for Scaffolder in Site File)?
-
Is a handover certificate available for the scaffold in use?
-
Does the scaffold have a current in date scaff-tag?
-
Is the scaffold platform blocked at any point?
-
Is impact protection fitted to scaffolding in areas where the resident and/or pedestrians could come into contact with it?
-
Does scaffolding have a gate access that opens inwards and closes fully to prevent falls from height?
Ventilation
-
Are ventilation improvements required?
-
Is there evidence of damp or mould on internal surfaces in the property?
-
Are trickle vents present, functional and as per the ventilation strategy?
-
Are door cuts present, functional and as per the ventilation strategy?
- Yes
- No
- N/A
-
Are IEV/MIV present, functional and as per the ventilation strategy?
-
Are core vents present, functional and as per the ventilation strategy?
-
Are Soffit Vents, present, functional and as per the ventilation strategy?
-
Are Tile vents, present, functional and as per the ventilation strategy?
-
Are Lap vents, present, functional and as per the ventilation strategy?
-
Is cross flow ventilation present, functional and as per the ventilation strategy?
External Wall Insulation
-
Is a External Wall Insulation being installed?
-
Is the insulation material being installed in line with the measure design?
-
Are works to service mountings and / or penetrations in line with the measure design?
-
Are works to the DPC in line with the measure design?
-
Are works to porches, canopies and similar structures in line with the measure design?
-
Are works to conservatories in line with the measure design?
-
Are works to unique and / or Architectural Features in line with the measure design?
-
Are works to window/door reveals in line with the measure design?
-
Are works adjacent to outbuildings / structures in line with the measure design?
-
Are works to ginnels / alleyways in line with the measure design?
-
Are works at roofline in line with the measure designs?
Internal Wall Insulation
-
Is Internal Wall Insulation being installed?
-
Is the Insulation Material being installed in line with the measure design?
-
Does the insulation overlap or connect with other insulants in the property in line with the measure design?
-
Does the insulation return onto party walls in line with the measure design?
-
Are areas of reduced thickness installed as per the measure design?
Loft Insulation
-
Is Loft Insulation being installed?
-
Is the insulation material used in line with the measure design?
-
Has electrical cabling been re-routed as required by the measure design?
-
Have lighting units been accommodated as required by the measure design?
-
Has the loft hatch been treated as required by the measure design?
-
Has the insulation material been appropriately cross laid?
Cavity Wall Insulation
-
Is Cavity Wall Insulation being installed?
-
Is the insulation material used in line with the measure design?
-
Are injection holes suitably sized and (if measure complete) suitably pointed
-
Is there any evidence of insulation material within air vents?
-
Is there any evidence of insulation material leakage?
Underfloor Insulation
-
Is Underfloor Insulation Being Installed?
-
Is the insulation material used in line with the measure design?
-
Is there any evidence of air pockets in the insualtion?
-
Has any necessary pipework be rerouted in line with the measure design?
Air Source Heat Pump
-
Is and Air Source Heat Pump being installed?
-
Is Unit Capacity in line with the measure design?
-
Is Unit Siting in line with the measure design and applicable regulations?
-
Is Unit Cylinder Size in line with the measure design?
-
Is number of Radiators in line with the measure design?
-
Are pipe runs and condition in line with the measure design?
Electric Storage Heaters
-
Are electric storage heaters being installed?
-
Are the specified number of units installed in line with the measure design?
-
Is the specified make and model installed in line with the measure design?
-
(Where applicable) is the specified controller (if stand alone) installed in line with the measure design?
Solar PV
-
Is Solar PV being installed?
-
Are all components in line with the measure design?
-
Are cable runs in line with the measure design?
-
Is the number of panels installed in line with the measure design?
-
Is the size of inverter in line with the measure designs?
-
Is the location of the inverter in line with the applicable regulations and guidance such as MCS and Manufacturer documents?
-
Has a hard wired and tamper proof smoke detector been installed?
Customer Handover
-
Are works to the property complete?
-
Does the customer understand how to operate the measures installed?
-
Is the customer aware of their maintenance, cleaning and servicing obligations for the measure(s) installed?
Miscellaneous Observation(s)
-
Is there anything additional or unique which requires the Contractors attention at the property?