Information

  • Document No.

  • Conducted on

  • Prepared by

  • Location

rEvo Build Checklist

  • Wake up electronics (open and exposed, never sealed)

Record Cell mVolts at ambient air

  • Record Cell #1 mV

  • Record Cell #2 mV

  • Record Cell #3 mV

  • Check EXT battery - fire solenoid for 10 seconds > 6.5V

  • Record EXT battery mV >6.5

  • Check oxygen sensor life . < 7 months , if not replace and date

  • Analyze DIL and OXY gases

  • Record Oxygen%

  • Record Diluent %

  • Connect tank and valves

  • Install moisture pads

  • Fill or check time on scrubber. Top marker on exhale/top. RMS arrow up.

  • Close Cover

Loop check/non return valves check

  • Suck and blow test - confirm one way only with seal

  • Install Loop

  • Wrap and install HUD

  • Turn ON/OFF Dil and OXY

  • Record DIL pressure (psi or bar)

  • Record OXY pressure (psi or bar)

Positive Check

  • Close DSV

  • Despressurize DIL/OXY until gauge reads 0

  • Listen to OPV operation

  • Listen for any leaks (2-3 minutes)

  • Open DSV and listen for positive (woosh)

Negative Check

  • Suck negative - closing DSV on large inhale

  • Look for hose scrunched together (2-3 minutes)

  • Open DSV listen for negative "suction"

Calibrate Shearwater

  • Turn on oxygen

  • Turn on Shearwater - confirm oxygen % in system setup

  • Inflate O2 full, suck empty, repeat 3-4 times, watch Po2 max out, and Mv max out

  • Close DSV - open "crack" vent out line pressure

  • Record Cell #1 mV

  • Record Cell #2 mV

  • Record Cell #3 mV

  • Close DSV - Open "crack" to vent out line pressure

  • Confirm calibrate on Shearwater

Calibrate rEvo Dream - immediately upon Cal of Shearwater

  • Confirm oxygen on Shearwater to adjust oxygen on Dream to match - see manual

  • 3 Pushes to access "P-5"

  • Record Cell #1 mV

  • Record Cell #2 mV (if applicable)

  • Confirm Battery Life

  • < ____ Hours Operation or factory replace battery

  • Close DSV fully

  • Shut rEvoDream off within 2 minutes to conserve battery

  • Oral inflate wing to max (check for leaks)

  • 2-3 min breath check /or shut down and ready for dive mode

Bail Out Check

  • Check valve is in off position

  • Suck gently to confirm "no leak" diaphragms

  • Turn valve on - record pressure (psi or bar)

  • Breath bail out regulator

  • Record bail out gas mixture

  • Confirm bail out gas in Shearwater

  • Ready to Dive. GO TO PRE JUMP CHECKLIST

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.