Information
-
Site Inspected:
-
Client
-
Conducted on
-
Advisor:
-
Site Manager
-
Project Number:
Metrics - Review of previous full working week
-
Hours worked during last reporting period
-
Accidents/Incidents in last reporting period
-
Near misses in last reporting period
-
Safety Audits and Inspections in last reporting period
-
Inductions undertaken in last reporting period
-
Training (TBT's, etc) in last reporting period
Risk Rating Scoring. 0 = Standards meet regulatory requirements and industry best practice, or item is not applicable. 1 = Standards fall short of industry best practice. 2 = Improvement needed to avoid breach of regulation. 3 = Breach of regulation, immediate action required to reduce the risk of harm and/or enforcement action.
Accidents, Dangerous Occurrences or Near Misses since last visit.
-
Provide details.
0 Previous Inspections.
-
Have matters identified during previous inspection been satisfactorily addressed.
-
Recommended Actions.
1 Scaffolds and Mobile Towers
-
Designed - handed over - erected in accordance with recognised standards - statutory inspections carried out etc.
-
Recommended Action.
2 Ladders, Stepladders, Podiums etc.
-
Fit for purpose - in good order - secured - inspected etc.
-
Recommended Actions.
3 Demolition.
-
Demolition plan in place - work carried out in accordance with plan etc.
-
Recommended Action.
4 Excavations & Groundworks.
-
Safe digging - supported/battered - statutory inspections - access/egress etc.
-
Recommended Action.
5 Lifting Operations.
-
Lifting plan - testing/certification - ground conditions - SWL etc.
-
Recommended Action.
6 Mobile Plant & MEWPs.
-
Fit for purpose - tested/inspected etc.
-
Recommended Action.
7 Portable Tools.
-
PAT - fit for purpose etc.
-
Recommended Action.
8 Access/egress.
-
Adequate - maintained in good order etc.
-
Recommended Action.
9 Electricity
-
Inspection/test - isolation/lock off etc.
-
Recommended Action.
10 Environmental.
-
Waste management - spill kit - noise - dust - mud etc.
-
Recommended Action.
11 Fencing/security.
-
Adequate - maintained etc.
-
Recommended Action.
12 Contractor Management.
-
Co ordinated - supervised etc.
-
Recommended Action.
13 Personal Protective Equipment.
-
Fit for purpose - face fit tested etc.
-
Recommended Action.
14 Edges/openings/stairways.
-
Adequately guarded - handrails on stairs - stairs unobstructed etc.
-
Recommended Action.
15 Site Good Order
-
Housekeeping - slips/trips/falls - lighting etc.
-
Recommended Action.
16 Fire Precautions.
-
Fire plan - alarms - signage - extinguishers - exit routes - muster point - flammables etc.
-
Recommended Action.
17 Occupational Health
-
Noise - HAVS - MSDs - Dermatitis etc
-
Recommended Action.
18 Welfare
-
Sufficient facilities - adequately equipped - suitably maintained.
-
Recommended Action.
19 First Aid
-
A&E location - first aiders - equipment.
-
Recommended Action.
20 Competency
-
Site inductions - tool box talks - training etc.
-
Recommended Action.
21 Documentation
-
Construction Phase Plan - Pre Construction information - statutory notices
-
Recommended Action.
22 Asbestos.
-
Survey report - management plan - re occupation certificate - licensed work - Asbestos Awareness etc
-
Recommended Action.
23 Safe Systems of Work
-
Method Statements - COSHH - Risk Assessments - Permits etc.
-
Recommended Action.
24 Traffic Management
-
Traffic plan - segregated routes - routes maintained - signage etc.
-
Recommended Action.
25 Temporary Works
-
Designed - co ordinated etc.
-
Recommended Action.
26 Worker Engagement & Consultation
-
Arrangements, evidence.
-
Recommended Action.
27 CDM Engagement
-
Are there any delays due to design responses?
-
Are CDM risks annotated on drawings, written register, both or neither?
-
Have all risks been mitigated to the lowest possible level?
-
Any additional Comments on CDM
-
Overall Comments:
-
Site Manager Action / Comments:
-
Advisor