Information
-
Audit No.
-
Client
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SITE CONTROLS
-
Is Gang Pack on site and in date?
-
Are permit boards on display showing correct information?
-
Is traffic and pedestrian management in accordance with chapter 8?
-
Are all operatives on site wearing correct PPE for the task?
-
Has Daily Safety Checklist been completed with time spent on vibrating tools recorded?
-
Are there stat drawings and/or calibrated CAT on site?
-
Is there a Streetworks Card holder on site?
-
Are all operatives wearing valid Riney ID Card?
-
Have operatives assessed the environmental aspects their works may cause?
-
Has consideration been given to all stakeholders affected?
Audit Risk Level
-
Risk rating for this Audit.
Corrective Actions
Sign off
-
Person conducting this Audit.
-
Audit concluded at: