Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Risk Assessment
-
Are there enough safety precautions against physical hazards that may affect the Operatives on site? E.g.exposed wiring, loose fittings, damaged pathways, decay pole??
-
Are there any unsafe areas the Operatives must access or pass through to complete their work?
-
Are there sufficient arrangements to avoid sharp injuries? Safety Gloves, PPEs.
-
Is team is fully equipped with required PPEs and tools?
-
Is there adequate lighting on site whilst operatives are working?
-
Are RTA procedures/safety Guidelines being followed?
-
Are there adequate safety arrangements in place for public and traffic and other road users?
-
Are there adequate safety arrangements in place to perform safe digging/ excavation?
-
Does team have enough and correct barricades/ cones and warning /safety signs to perform activity safely?
-
Is there first aid box, qualified first aider available to deal with emergency?
-
Are fire safety arrangements in place?
-
Are there enough safety measures in place to perform activity safely Without being exposed to harmful/hazardous substances)
-
Are there sufficient arrangements in place to ensure workers safety? Extreme/hot weather? Welfare arrangements (water) etc
-
Is there any leakage or damage to the tools / machines being used on site that poses a safety risk?