Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Set Up
-
Driving at work
-
Access to and from sites including segregation
-
Site set up and placing of fence panels
-
Activities in site compound
-
Temporary Accoodation
-
Fork Lift Trucks
-
Unloading of vehicles
-
Temporary Electrical Services
-
Confined Spaces Entry
-
Manhole Confined Space Entry
-
Asbestos
Common
-
Manual Handling
-
Young Persons
-
General Labouring
-
Lone Working
-
Hand tools
-
Electrical tools
-
Use of Angle Grinder
-
Use of step ladders
-
Use of ladders
-
Mobile Scaffolds
-
MEWP
-
Fixed Scaffolding
-
Suspended Cradles
-
Use of hoists
-
Use of Safety Harnesses
-
Access Iver Open Grid Walkways and Covers
-
Refuelling of Plant & Equipment
-
Waste Handling & Recycling
-
Working in or near Water
-
Pressure Washer
Ground works
-
Plant Inspection
-
Buried Services including Weils Disease. CAT & Genny survey completed by:
-
Site Clearance before Demolition
-
Roadworks
-
Use of Stone Saws
-
Excavation Work
-
Forming Holes in Floor Slabs
-
Hydraulic & Pneumatic Tools
-
360 Excavators & 180 Backhoe Loaders
-
Use of excavators
-
Contaminated Land
-
Forward Tipping Dumper
-
Telehandler
-
Ride on Roller
-
Pedestrian Operated Roller
-
Vibrating Plate Compactor
-
Work on Live Sewage
-
Pipe Laying
-
Pressure Testing
-
Work in Public Access Areas (Drainage)
-
Work at Height (excavations)
-
Concrete Operations - Pre-Cast / Pouring Slab
-
Landscaping
-
Tree work
-
Chainsaws
-
Hand Lay Asphalt & Tarmac
-
Quick Hitches
-
Trench Sheets & Manhole Braces
-
Snow Clearance
Steelworks
-
Erection of Steel Structures
-
Welding
Bricklaying
-
Bricklaying
-
Bricklayers Access & Egress
-
Loading Out of Bricks, Blocks & Mortar
-
Dismantling Outer leaf of Single Storey Brickwork
-
Forming external openings
-
Forming Openings in Internal Walls
-
Removal or Demolition of Non-Structural Partitions
-
Stone Masonry
-
Stonework at High Level
-
Placing Roof Trusses
-
Cement Mixers
Roofing
-
Roof Works
-
Roof Work on Flat Roofs
-
Lead Work
-
Use of Liester Guns
Plumbing
-
Plumbing (first fix)
-
Plumbing (second fix)
Joinery
-
Joinery Work
-
False work
-
Falsework at High Level
-
Construction of Non-load Partition Framework
-
Removal or Replacement of Rainwater Goods
-
Replacement or Repairs of Fascias and Soffits
-
Replacement of Windows
-
Replacement of Windows
-
Cartridge Operated Tools
Finishes
-
Dry Lining
-
Plastering
-
Plastering External Render
-
Glazed Tiling
-
Painting
-
Glazing
-
Abrasive Cleaning
Other
-
Electrical Work
-
Isolations and Lock offs
-
OHPL
Corrective Actions
-
Enter any corrective actions that will be undertaken
Sign Off
-
On site representative
-