Information

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Set Up

  • Driving at work

  • Access to and from sites including segregation

  • Site set up and placing of fence panels

  • Activities in site compound

  • Temporary Accoodation

  • Fork Lift Trucks

  • Unloading of vehicles

  • Temporary Electrical Services

  • Confined Spaces Entry

  • Manhole Confined Space Entry

  • Asbestos

Common

  • Manual Handling

  • Young Persons

  • General Labouring

  • Lone Working

  • Hand tools

  • Electrical tools

  • Use of Angle Grinder

  • Use of step ladders

  • Use of ladders

  • Mobile Scaffolds

  • MEWP

  • Fixed Scaffolding

  • Suspended Cradles

  • Use of hoists

  • Use of Safety Harnesses

  • Access Iver Open Grid Walkways and Covers

  • Refuelling of Plant & Equipment

  • Waste Handling & Recycling

  • Working in or near Water

  • Pressure Washer

Ground works

  • Plant Inspection

  • Buried Services including Weils Disease. CAT & Genny survey completed by:

  • Site Clearance before Demolition

  • Roadworks

  • Use of Stone Saws

  • Excavation Work

  • Forming Holes in Floor Slabs

  • Hydraulic & Pneumatic Tools

  • 360 Excavators & 180 Backhoe Loaders

  • Use of excavators

  • Contaminated Land

  • Forward Tipping Dumper

  • Telehandler

  • Ride on Roller

  • Pedestrian Operated Roller

  • Vibrating Plate Compactor

  • Work on Live Sewage

  • Pipe Laying

  • Pressure Testing

  • Work in Public Access Areas (Drainage)

  • Work at Height (excavations)

  • Concrete Operations - Pre-Cast / Pouring Slab

  • Landscaping

  • Tree work

  • Chainsaws

  • Hand Lay Asphalt & Tarmac

  • Quick Hitches

  • Trench Sheets & Manhole Braces

  • Snow Clearance

Steelworks

  • Erection of Steel Structures

  • Welding

Bricklaying

  • Bricklaying

  • Bricklayers Access & Egress

  • Loading Out of Bricks, Blocks & Mortar

  • Dismantling Outer leaf of Single Storey Brickwork

  • Forming external openings

  • Forming Openings in Internal Walls

  • Removal or Demolition of Non-Structural Partitions

  • Stone Masonry

  • Stonework at High Level

  • Placing Roof Trusses

  • Cement Mixers

Roofing

  • Roof Works

  • Roof Work on Flat Roofs

  • Lead Work

  • Use of Liester Guns

Plumbing

  • Plumbing (first fix)

  • Plumbing (second fix)

Joinery

  • Joinery Work

  • False work

  • Falsework at High Level

  • Construction of Non-load Partition Framework

  • Removal or Replacement of Rainwater Goods

  • Replacement or Repairs of Fascias and Soffits

  • Replacement of Windows

  • Replacement of Windows

  • Cartridge Operated Tools

Finishes

  • Dry Lining

  • Plastering

  • Plastering External Render

  • Glazed Tiling

  • Painting

  • Glazing

  • Abrasive Cleaning

Other

  • Electrical Work

  • Isolations and Lock offs

  • OHPL

Corrective Actions

  • Enter any corrective actions that will be undertaken

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.