Title Page
-
RIZON JOB#
-
Conducted on
-
Prepared by
-
Location
-
THIS IS TO BE COMPLETED AND UPLOADED TO THE JOB FOLDER PRIOR TO ANY WORKS COMMENCING
-
Is there a BAS representative at time of inspection?
GENERAL HAZARDS
-
Is there any Rubbish / Debris left onsite?
-
Does the Rubbish / Debris prohibit assessment from being carried out?
-
Can Rubbish / Debris be removed safely by contractors?
-
Have any Sharps been identified in Rubbish / Debris?
-
Do Contractors need to be informed of possible sharps to Rubbish / Debris?
ELECTRICAL
-
Is there any live wire's exposed?
-
Does a Electrical contractor need to carry out a make safe?
-
Do RCD's require a lock out tag?
ASBESTOS
-
Is there a Asbestos register / approved stickers onsite? Check on kitchen sink door, linen cupboard door?
-
Has Asbestos sheeting been damaged?
-
Is there Asbestos debris on ground?
-
Has an Asbestos Removal contractor been organised to remove debris?
-
Have trades been notified about Asbestos on property?
HEIGHT
-
Do any of the repairs require working from a height above 2m?
-
Have trade's been notified of works that are above a height of 2m?
-
Have trades been notified of requirements for working at heights?
GENERAL
-
Signature of person conducting Assessment