Information
-
Authorization to cut walls and waiver of liability for such
-
Client Name
-
Conducted on
-
Prepared by
-
Location
-
Waiver for Chasing (Cutting or trenching of Walls/floor)
-
This must be signed before any chasing/trenching of walls or floors will commence. All due care is taken before
chasing/trenching of walls or floors is started. We have checked the below services and we believe that the
chasing of the walls or floors in this location should not result in any damage. Unfortunately we are
unable to completely know what is located inside the wall. Whilst we take due care in this process if
services inside the wall are damaged we will organise for the repairs to be effected immediately but
the cost of such repairs agrees to be borne by the customer who signs this authorisation -
Checked location for water pipes?
-
Checked location for Gas piping
-
Checked location for Electrical Cables
-
Checked both side of the wall where possible
Client Information
-
Name of Client
-
Select date
-
Add signature
-
By signing this authorization you agree that you have read this document and that Riverton Electrical will NOT be held responsible for any repair costs associated with the cutting or chasing of the Wall floor as required. This includes but is not limited to water pipes, drain pipes, gas pipes, vacumn pipes and cabling.