Title Page
-
Conducted on
-
Prepared by
-
Venue/Location
-
Event
Bump IN Event Safety Checklist
-
Stairs to floor either pushed in or gates/wood in place?
-
Check floor, loading dock and backstage for slips/ trips/ fall hazards?
-
Is lighting in all work areas adequate?
-
Is temperature and airflow is regulated and adequate for working especially in roof space?
-
Truck parking plan discussed with relevant production contact?
-
Has ops checked in with gate keeper to discuss truck management and parking?
-
Are access route/gates clear for production and emergency services access?
-
Blind corners where vehicles pass have been eliminated or sign posted?
-
Are all departments toolboxes completed (MOP, Production, Rigging, other) spot check undertaken and noted below?
-
Are risk assessments undertaken and documented for any unusual/high risk work (i.e hot works)?
-
Are all staff inducted and aware for the hazard reporting procedures? Spot check and note below..
-
Any incidents and/or near misses are documented and entered into IMS?
-
Area all warning systems (lighting and signage) in place, working and not obscured? (Includes rigging lights, work zones signs, forklift & Vehicle warning signs)
-
MOP PPE requirements, House PPE accessible including hard hats, hi vis & Ear plugs?
-
Are all staff are compliant with MOP PPE requirements? if not note below.
-
First Aid staff on site as per event safety plan?
-
First Aid kits in place stocked and clearly signposted?
-
Housekeeping - Are all storage areas are tidy with equipment safely stacked and not causing obstruction? All departments.
-
Is all firefighting and spill equipment in place, functioning & unobscured?
-
Emergency egress - Are all doors clear of obstruction, functioning and well lit? Nothing holding open fire doors. <br>
-
Are all Emergency EXIT signs are operational?
-
Area all Emergency assembly points checked and clear of obstruction and hazards?
-
Electrical safety - Spot check undertaken of MOP and/or Production equipment for Test and Tag Compliance? Note item below..
-
Are all rigging, weights and scaffolding work signed off and supervised by MOP Head Rigger and spotters?
-
Signed:
-
Co- signed: