Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Shop and Area Readiness
Shop and Area Readiness
-
Is the shop area in good clean condition<br>and are parts and tools organized? (General<br>Cleanliness/ Condition (5S)
-
Is the shop area in good clean condition<br>and are parts and tools organized? (General<br>Cleanliness/ Condition (5S)
-
Has the eye wash station been inspected<br>weekly and are the inspections up to date?
-
Has the fire extinguisher been inspected<br>monthly and is the inspection up to date?
-
Check the flammable cabinet for the<br>following; Flammable products organized?<br>No other products other than flammable<br>liquids stored in the cabinet? MSDS<br>available? Is the cabinet grounded?
-
Inspect the Personal Protective Equipment<br>for the following; Have the gloves been<br>inspected within the last 6 months? Is PPE<br>equipment in good working condition and<br>kept dry and hung in a safe ventilated area?
-
Inspect all tools; Are the tools properly<br>stored and kept organized? Are the tools<br>found in good working condition? Are the<br>operational instructions posted at each<br>work bench?
-
Are the JSA forms posted in the shop?
Parts Area
-
Is the spare parts area in good clean<br>condition and are the parts organized?<br>(General cleanliness/ 5S)
-
Perform an inventory check on 15 different<br>parts. Are the parts found in their right<br>location? Does the quantity listed in EAM<br>match with the physical count?
CMMS
-
Run a Material MetaData Enhancement<br>report<br>EAM>Reports>Materials>Details>AMZ -<br>Materials MetaData Enhancements. Do all<br>parts have a Min and Max setup? Does<br>every part have a manufacture part #? Do<br>all part have a Catalog description?
-
Run a report for Equipment not on PM.<br>EAM>Core>Work>Function>Equipment Not<br>on PM Schedules. Does all of the<br>equipment have PMs assigned?
-
Run a W.O. aging report. Are all WOs less<br>than 30 days old?
-
Run the Equipment Not Generated PMs<br>Report on the SSRS website (http://<br>atseamdbue1c02:8080/Reports/Pages/<br>Folder.aspx) under Operational Reports. Are<br>all PMs generated?
PM Audit (Audit 5 PM's from previous week)
-
Have the guards/pans been emptied<br>or cleaned?
-
Is the floor free of belt/metal shavings or<br>debris under conveyors?
-
Have the bearings been greased and<br>covers replaced?
-
Are the gearboxes and bearings free of<br>audible grinding or extreme heat?
-
Visually, do all parts appear to be in place?
-
Are belts tracking correctly?
MHE and Production Area
-
Is the production area and MHE equipment<br>clean and following 5S?
-
Are the conveyors guarded?
-
Are the belt tracking correctly?
-
Is the site free of any noisy bearings<br>indicating a bearing failure?
-
Are electrical panels unobstructed<br>and labeled?
-
Is the site free of broken conduits or<br>missing knockouts?
-
Have the eye wash station been inspected<br>weekly and are the inspections up to date?
-
Have the fire extinguisher been inspected<br>monthly and is the inspection up to date?
Automation Engineering (AE)
-
Are the technical documentation (VFD<br>parameter, VLC program and electrical<br>schematics) backed up?
-
Is the site equipped with the necessary<br>controls software and hardware (i.e. laptop<br>with RSLogix, 1 laptop with FlexPC,<br>ProfiTrace analysis kit, ASi bus analysis kit,<br>megger, multi meter, etc…)
Building Cleanliness
-
Is the associate entrance clean?
-
Is the cafeteria kept clean and organized?
-
Are restrooms clean, stocked and free<br>of graffiti?
-
Is the office area clean, trash picked and<br>are carpets vacuumed?
-
Is the production area free of broken<br>pallets, stairs swept and free of dust?
-
Is the smoking area clean, trash picked up<br>and free of graffiti?
-
Is the truck yard kept clean and free<br>of debris?
HR Engagement
-
Talk to the site leader regarding the RME<br>team on site. Is the site leader happy with<br>the teams performance?