Title Page
-
Conducted on
-
Prepared by
-
Location
-
Date:
-
Location:
-
Contractor (Crew):
-
Weather Condition:
Existing Pavement Temperature Standard Binders AR450, C320
Existing Pavement Temperature PMB binder
Setting Out / Traffic Control
-
Time TC Commenced.
-
No of TC’s recorded on site.
-
No of VMS recorded on site
-
TC employing appropriate signage, diversions, detours operating without undue disruption.
-
Initial site check record of any existing defects prior to commencement including but not limited to: K&G, driveways, traffic islands, speed arresting devises, rumble bars, lane delineation markers, driveways, laybacks, stormwater drains, lintels, footpaths, signs, posts, nature strip.
Cold Milling of asphalt
-
Time milling commenced.
-
Check the proposed pattern for worn teeth (uneven surface), check the water usage (dust prevention)
-
Asphalt milling depth compliant with the relevant shift plan
-
Removal of milled asphalt, no damage to infrastructure as listed above.
-
Profiled area free from any defective pavement/base areas. Soft/unsuitable base options for rectification
-
Time milling completed
Bitumen emulsion tack coating
-
Tack coating material applied evenly with no pooling or overspraying
-
Tack coat fully broken, free of surface water, and intact
Placing of Asphalt
-
Time paving commenced:
-
Asphalt temperature delivered to paver immediately prior to placement
-
Visually confirm the shape of the new asphalt mat
-
Asphalt mat thickness conforms to the requirement
-
No unnecessary handwork or broadcasting over the fresh matt
Asphalt Joints
-
The longitudinal joint are straight and parallel to the centre line (Joints should be located away from the traffic wheel path), offset by 150mm between layers
-
Tranverse joints cut back where required, square and true, offset by 2m between layers
-
Tie in joints squared off
-
Time paving completed
Compaction
-
Temperature of asphalt at initial compaction:
-
Roller pattern followed and required compaction achieved
-
Transverse Joints satisfying density and shape requirements via combined longitudinal/transverse rolling
-
Longitudinal Joints satisfying density and shape requirements for either hot or cold procedure
Carriageway Surface Shape
-
Carriageway Compliant Surface Shape – crown requirements, ride quality, avoidance of trip hazards, tie ins to crossings
-
Homogeneous surface finish produced, defect free
Completion / Open to traffic
-
Final site check compliant no defects, damage, quality issues.
-
Quantity Agreement mix final tonnage
-
Asphalt Docket copies obtained
-
Temporary line marking and stick and stomps reinstated compliant with design and prework locations.
-
Surface Temperature of asphalt < 60 degrees
-
Ensure the site is safe for opening to live traffic
-
Time completed