Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Plot no.

Commissioning

Gas boiler

  • Make and model

  • Serial number.

  • Visual inspection of boiler and accesable gas pipework.

  • Flue connected and installed to MI's.

  • Tightness test

  • Flue analyser test.

  • Flue integrity test. (Analyser in air intake or boiler housing).

  • Flue seals on and pushed back.

  • Standing pressure, working pressure.

  • Gas rate.

  • Pressure relief tested.

  • Expansion vessel tested.

  • Heating pressure correct.

  • Picture of Benchmark booked.

  • Picture of boiler serial number.

  • Picture of boiler book serial number.

Cylinder commission.

  • Visual inspection.

  • TPRV and PRV tested

  • Water flow measured.

  • Hot water tempreture checked at nearest outlet ( no thermostatically controlled outlets.

  • Strainer in combi valve cleaned from debris and paste.

  • Immersion thermostat tempreture check and not on maximum.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.