Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Plot no.
Commissioning
Gas boiler
-
Make and model
-
Serial number.
-
Visual inspection of boiler and accesable gas pipework.
-
Flue connected and installed to MI's.
-
Tightness test
-
Flue analyser test.
-
Flue integrity test. (Analyser in air intake or boiler housing).
-
Flue seals on and pushed back.
-
Standing pressure, working pressure.
-
Gas rate.
-
Pressure relief tested.
-
Expansion vessel tested.
-
Heating pressure correct.
-
Picture of Benchmark booked.
-
Picture of boiler serial number.
-
Picture of boiler book serial number.
Cylinder commission.
-
Visual inspection.
-
TPRV and PRV tested
-
Water flow measured.
-
Hot water tempreture checked at nearest outlet ( no thermostatically controlled outlets.
-
Strainer in combi valve cleaned from debris and paste.
-
Immersion thermostat tempreture check and not on maximum.