Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General Items
-
Has an ICRA been performed prior to the start of work in all areas?
-
Have all ICRAs been filed, and made accessible to everyone necessary?
-
Have all ICRAs been reviewed by the Owner's Representatives (IC Officer), and RCCI Staff?
-
Have requirements of all active ICRAs been communicated to all Subcontractors performing work in the associated areas?
-
Have all Employees reviewed the Infection Control Video prior to starting work?
Airflow & Monitoring
-
Has a negative airflow been established in all areas of work?
-
Is a negative pressure indicator (ie manometer, etc) in place at each area of work?
-
Is airflow & air quality being monitored on a regular basis?
-
Are airflow & air quality reports being received & filed on a regular basis?
-
Are all Negative Air Machines functioning properly?
-
Have the appropriate Filters been installed and maintained in each Negative Air Machine?
-
Is the leading edge of all Duct sealed?
-
Are all Duct returns capped, terminated, or filtered?
-
Has all stored Duct been sealed appropriately?
Housekeeping
-
Are areas of work being kept clean/swept in order to minimize track-out?
-
Are all corridors and surrounding areas swept and clean (no track-out)?
-
Are all Trash Bins, Gondolas, Carts, etc covered when exiting areas of work?
-
Are the wheels of all Bins, Gondolas, Carts, etc cleaned prior to exiting areas of work?
-
Have walk-off Mats (sticky, damp, or other) been installed at the exit to each area of work?
PPE
-
Is appropriate PPE being worn when necessary (gowns, booties, masks, etc)?
Area Isolation & Access Control
-
Have sealed Partitions been installed around each area of work?
-
Do all Temp Doors into areas of work latch appropriately?
-
Have Closures been installed on all Temp Doors?