Title Page

  • Project name

  • Conducted on

  • Prepared by

  • Location (Block no / Elevation / Floor / Gridline)

  • Has Rockwool Rainscreen Duo Slab been used?

  • Has the correct thickness of insulation been applied to the correct area in line with the construction issue drawings

  • Has the product been installed with the printed patterned side facing outwards?

  • Have the slabs been installed close butted at all horizontal and vertical joints. Laid vertically with horizontal joints staggered? (as per page 9 rainscreen-duo-slab-installation-guide).

  • Has Ejot JT3-D-6H-5.5/6.3 been used as the centre fixings (stainless steel) with SF-P-SS-70-D A2 Stainless Steel insulation washer (min diameter of washer 70mm)? (Check Fixing Design - Drawing incorrect and showing a masonry pin Drawing 2764

  • Has Ejot JT2-D6-5.5/6.3 been used as the perimeter fixings (galvanised steel) with SF-P-70-D Galvanised Steel (min diameter of washer 70mm)?

  • Has the insulation been carefully cut and tightly fitted around any cladding support/penertrations/fire breaks.

  • Is the layer ready for handover to the client team

Snagging

  • Item 1

  • Item 2

  • Item 3

  • Date issued to subcontractor

  • Date snagging completed

  • Any onsite feedback from the client

  • Client sign off

  • Building control sign off

  • Other party sign off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.