Title Page
-
Project name
-
Conducted on
-
Prepared by
-
Location (Block no / Elevation / Floor / Gridline)
-
Has Rockwool Rainscreen Duo Slab been used?
-
Has the correct thickness of insulation been applied to the correct area in line with the construction issue drawings
-
Has the product been installed with the printed patterned side facing outwards?
-
Have the slabs been installed close butted at all horizontal and vertical joints. Laid vertically with horizontal joints staggered? (as per page 9 rainscreen-duo-slab-installation-guide).
-
Has Ejot JT3-D-6H-5.5/6.3 been used as the centre fixings (stainless steel) with SF-P-SS-70-D A2 Stainless Steel insulation washer (min diameter of washer 70mm)? (Check Fixing Design - Drawing incorrect and showing a masonry pin Drawing 2764
-
Has Ejot JT2-D6-5.5/6.3 been used as the perimeter fixings (galvanised steel) with SF-P-70-D Galvanised Steel (min diameter of washer 70mm)?
-
Has the insulation been carefully cut and tightly fitted around any cladding support/penertrations/fire breaks.
-
Is the layer ready for handover to the client team
Snagging
-
Item 1
-
Item 2
-
Item 3
-
Date issued to subcontractor
-
Date snagging completed
-
Any onsite feedback from the client
-
Client sign off
-
Building control sign off
-
Other party sign off