1.0 Guard Rail

1.1 Guard Rail Required

1.2 Top Rail, 42 inches (+ / - 3) above working surface.

1.3 Mid Rail, 21 inches (+ / - 3) above working surface.

1.4 Toe-board for work above 10 ft.

1.5 Guard Rail.
(Max 25 Points)
Add media
2.0 Fixed Stairs

2.1 Fixed Stairs

Fixed Stair
Max (20 points)
3.0 Fixed Ladder

3.1 Fixed Ladder

3.2 Secured to Wall or Structure

3.3 Safe to Climb

3.4 Fixed Ladder
(10 Points Max)
4.0 Extension Ladder

4.1 Extension Ladder Used

4.2 Has inspection tag.

4.3 Missing, bent, or broken parts

4.4 Missing fly rope.

4.5 3 ft. above landing or eave.

4.6 Secured at top.

4.7 Secured at bottom.

4.8 Extension Ladder
(10 Max Points)
Add media
5.0 PPE

5.1 Hearing Protection Required for Loud Noises.

5.2 Hard Hat worn for overhead hazards and work.

5.3 Longs Pants Required for Hot Work

5.4 Long Sleeved Shirt Required for Hot Work

5.5 Respirator Required.

5.6 Safety Glasses

5.7 Worn for tear off.

5.8 Worn for other eye hazards.

5.9 PPE worn correctly.

5.0 Personal Protective Equipment (PPE)
(5 Points Max)
Add media
6.0 Electrical

6.1 Electrical Used.

6.2 Wires inspected.

6.3 GFCI Used for Temporary Power Sources.

6.4 Work Remains 20 feet Away from Electrical Lines

6.5 Covers Required for Electrical Lines.

6.6 Electrical
(5 Points Max)
7.0 Material Hoisting

7.1 Trash Chute or Hoisting Used for Elevated Projects (20 feet or more)

7.2 Pallets Not Stacked More than 2 High

8.0 Cranes

8.1 Crane Used.

8.2 Crane Operator Trained.

8.3 Signal Person Trained and Communicates with Operator.

8.4 Sling tag available and serviceable for use.

8.5 Overhead Work Signs Posted near Hoisting Area(s).

8.6 Flagging or Warning Lines Around Crane and Lift Area.

8.7 Taglines Used for Material or Equipment Control.

8.8 Hoisting
(5 Points Max)
Add media
9.0 Fire Prevention

9.1 Extinguishers within 25 - 50 feet of Work.

9.2 Used / Spent Extinguishers removed from Project or Site.

9.3 Gas Cans Labeled and Stored.

9.4 Screen Located Within Gas Cans.

9.5 Fire Prevention
(5 Points Max)
Add media
10.0 Forklift

10.1 Forklift Used.

10.2 Forklift Operator Trained.

10.3 Daily Inspection Performed.

10.4 Rigger Trained and Communicates with Operator.

10.5 Signal Person Trained and Communicates with Operator.

11.0 General Liability

11.1 Nails Bent or Removed from Boards.

11.2 Roof Tie-in Performed Daily.

11.3 Plugs Removed from Drains.

11.4 Work logged Daily in a Journal.

11.5 Site or Project Inspected for Previous Damage.

11.6 Caution Signs Posted.

11.7 General Liability
(5 Points Max)
Add media
12.0 Emergency Readiness

12.1 First Aid Kit (with Eye Wash Bottle) On-Site and Available to Employees.

12.2 HAZCOM Manual On-Site and Available to Employees.

12.3 Safety Manual On-Site and Available to Employees.

12.4 Emergency Readiness
(5 Points Max)
Add media
13.0 Scaffold.

13.1 Scaffold Required

13.2 Scaffold has Hoist for Materials.

13.3 Access Secured at Night.

13.4 Inspected by Competent Person.

13.5 Scaffold has Green Tag for Use.

13.6 Scaffold is level.

13.7 4:1 Ratio and Tied to Building (Push / Pull)

13.8 Walk Boards Bent.

13.9 Scaffold
(5 Points Max)
Add media
14.0 Safety Talks

14.1 Performed Weekly, Signed & Turned In

Safety Talks
(5 Points Max)
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.