Title Page

  • Conducted on

  • Prepared by

  • Location

Room Architectural Snagging Checklist

  • Space No.

Doors

  • Is the Door Installed?

  • Does the door comply with the approved drawing?

  • How do you find the door Movement?

Door ironmongery

  • Is the Door Ironmongery Installed?

  • Does the door comply with the Specs?

  • How is the Door Ironmongery Functioning?

Door Accessories

  • Is Door Stop Installed?

  • Is Door Closer Installed?

Windows

  • Is the Window Installed?

  • Does the door comply with the approved drawing?

  • Is the Window Insect Screen Installed?

False Ceiling

  • How do you see the False Ceiling alignment?

  • Are the fixtures of the false ceiling installed?

Walls

  • Are the built walls according to the approved Layout?

  • How do you see the fairness of the wall Surface?

  • Are the Wall Guards & handrails installed?

Floor

  • Does the installed material comply with the approved sample?

  • Does the installed flooring comply with the approved Drawings?

  • Are all the Floor fixtures installed?

Sanitary Fixures

Sink

  • Is the Sink Fixed in the correct location as per the approved drawings?

  • How do yo see the alignment of the installed sink?

  • How do find the condition & the functionality of the sink?

Toilet

  • Is the Toilet Fixed in the correct location as per the approved drawings?

  • How do yo see the alignment of the installed toilet?

  • How do find the condition & the functionality of the sink?

  • Are the Hand Rails installed?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.