Title Page

  • Conducted on

  • Package (e.g. P1 / P3 / P5 / P6A)

  • Process Unit (e.g. RFCC / ARU / LLDPE / PP)

  • Prepared by

  • Team Members

  • Note: Separate each member by Comma sign ( , )

  • Location

Inspection Sheet

  • Instructions:
    1. Suitable PPE shall be worn when conducting walkabout
    2. Example of Equipment Tag Number: 3315-P-101 / 3200-A-210-P01
    3. Add TEXT or PHOTO if answer is NO.
    4. Add ACTION if Corrective Action is required on findings. Assignee will be UPT and can be left EMPTY.

  • Equipment

Equipment Details

  • Equip. Tag No. (e.g. 3315-P-101A)

  • Equip. Type

  • Equip. OEM

  • 1. Nameplate and pump tag number verified

Inspection Items

A. Foundation, Skid, Baseplate

  • 2. Skid installation, levelling checked

  • 3. Foundation, hold down bolts checked

  • 4. Epoxy grouting fully filled in baseplate, no crack or porosity observed

  • 5. No water ponding at baseplate, drip pan checked

B. Alignment

  • 6. Alignment jacking bolts fitted at driver

  • 7. Correct shim packs for driver fitted (between 3 - 5 max)

  • 8. Soft foot for driver checked

  • 9. Final alignment driver to driven checked

  • 9.1. Pre-alignment (before connect piping) checked

C. Preservation

  • 10. All rotating parts are covered with guard or covers or protected

  • 11. Type of Transmission?

  • 11. Accessible?

  • 11.1. Coupling spacer, hubs checked for corrosion, in good conditions

  • 11. Accessible?

  • 11.1. Belt checked in good condition, and no corrosion on pulley

  • 11. Accessible?

  • 11.1. Chain, sprocket checked for corrosion, in good conditions

  • 12. Lube oil for preservation filled up

  • 13. Lube oil piping, level gauge, oiler checked

  • 14. Preservation sheet displayed at site?

  • 14.1. Last preservation activity date

  • 14.2. "Manual / Hand Rotate of shaft" performed as per Preservation checklist?<br>( Select "N/A" if activity not stated in Preservation Sheet )

D. Piping & Support

  • 15. Suction and discharge flanges parallelism and bolts checked, bolts straight and unstrained

  • 16. Suction and discharge pipe support adequate

E. Auxiliaries & Accessories

  • 17. Instrumentation probes, gauges checked

  • 18. Check valve (arrow) in correct direction

  • 19. Casing drain valve, vent valve installed

  • 20. Auxiliary system - seal, cooling water system checked.

F. For Pumps Only ( choose NO and skip if not pump )

  • 21. Equipment is Pump?

  • 21.1. Mechanical seal locking pin in unlock / retracted position.

  • 21.2. Seal pot filled up with barrier / buffer fluid. Accumulator is pre-charge with N2

  • 21.3. Equipment is Hot Liquid Pump?

  • 21.3.1. Warm up line (check valve bypass is available)

G. Cleanliness & Housekeeping

  • 22. General cleanliness; Free of rust, debris, oil checked

  • 23. General condition; No damage, crack, loose, missing fasterners

H. Maintenance Accessibility

  • 24. Good accessibility for maintenance; removal and lifting components

  • 25. Suction strainer easily accessible and no restriction to remove

Other Observations

  • Additional Findings / Recommendations

Additional Photos (Optional)

  • Equipment Photo

  • --- END OF EQUIPMENT INSPECTION ---

Sign-off

  • Prepared by

  • Reviewed by ( Team Member / UPT )

  • Before MARK AS COMPLETE, kindly place NAME & SIGNATURE

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.