Information
-
Document No.
-
Plant
-
Conducted on
-
Prepared by
General Observations
-
Is there any damaged or defective equipment within this route
-
Are there any visible signs of leaks, steam, water/condensate, oil, ash or other medium.
-
Is all lagging in place and in a good state of repair
-
Are any unusual noises evident.
-
Is lighting in good order
-
Is flooring in a good state of repair
-
Are there any H&S issues to note within this route
Critical Operating Parameter Observations
-
COP #1 within NOC
-
COP #2 within NOC
-
COP #3 within NOC
-
Are all NOC's within spec
-
Has any non compliance been recorded on the electronic shift log
Operational Observations for this Route
-
Flow of boiler ash evident from all 8 hoppers
-
Is there an empty bag fitted to emergency bagging chute
Sign Off
-
Have any work orders being raised as a result of this inspection
-
Are there any issues which require immediate attention
-
IF the answer to the above question is YES has the matter been communicated to the relevant manager/supervisor
-
Has the route visual management board ben updated
-
Time/Date
-
Sign off