Documentation review - Prior to undertaking a plant/vehicle movement review, please make yourself familiar with Principal Contractor documents, (tick applicable)
-
Vehicle movement plan(s)
-
Safety Management System requirements for plant/vehicle movements.
-
SWMS covering plant/vehicle movements.
-
Other documentation the PC may have on plant/vehicle movements and controls.
-
TfNSW document, "Separate Yourself"
-
TfNSW document - TPR-G22 "Truck and Plant Requirements".
Review Questions
-
Are plant/vehicle routes delineated?
-
Are HV and LV routes separated and well identified?
-
Is radio communication required between plant/vehicles?
-
Are radio channel(s) well sign posted?
-
Monitor the radio channel(s) for a period - are comm's requirements being followed?
Spotters
-
Are spotters being used on-site? if NO go to next section.
-
Spotters are isolated from plant/vehicle movements?
-
Have good line-of-sight of plant/vehicles?
-
Are identifiable from general site workers?
-
Have radio communications?
-
Are vehicles/plant complying with their instructions?
-
Only perform spotter duties?
Review Questions continued
-
Have LV parking areas been established at the work area(s) which comply with Separate Yourself guidelines?
-
Have parking area(s) been established on risk management principles?
-
If hazards have not been eliminated are they controlled?
-
Have HV parking area(s) been established at the work site(s)?
-
Are HV parking areas level?
-
If HV parking area(s) are not level, has the risk of run-away been controlled?
-
If HV/plant are temporarily parked on-site, have they been turned off, gear box in "P" or an appropriate gear and handbrake applied?
Safety Devices
-
All plant/vehicles fitted with a roof mounted (or similar) rotating/flashing, amber light?
-
Audible, reversing squawker or buzzer?
-
Reversing camera? - NOT a requirement under TPR-G22
-
Reversing light? - NOT a requirement under TPR-G22
Safety Devices - Nonconformities
-
If either plant or HV have an inoperable or inaudible reversing alarm, they must not continue to operate and should be removed from site. As per TGR-G22
Administrative Controls
-
Have pre-start checks been completed on plant?
-
Are plant movements and associated hazards discussed at pre-start meetings?
-
Plant operators have undertaken a VOC for this project?